Browse
Search
Agenda - 09-15-2015 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-15-2015 - Regular Mtg.
>
Agenda - 09-15-2015 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2015 9:08:00 AM
Creation date
9/14/2015 8:25:18 AM
Metadata
Fields
Template:
BOCC
Date
9/15/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 09-15-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
RES-2015-048 Resolution for adopting Criteria for Design-Build Delivery Method for Construction Contract
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: September 15, 2015 <br /> Action Agenda <br /> Item No. 7-a <br /> SUBJECT: Adoption of Criteria Governing the Design-Build Method of Construction Project <br /> Delivery for County Projects <br /> DEPARTMENT: Asset Management Services PUBLIC HEARING: (Y/N) No <br /> ("AMS"), County Attorney, <br /> Department of Environment, <br /> Agriculture, Parks & <br /> Recreation ("DEAPR") <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> 1) Resolution Regarding Design-Build Jeff Thompson, 919-245-2658 <br /> Delivery Method Criteria John Roberts, 919-245-2318 <br /> 2) Site Illustrative of Contemplated David Stancil, 919-245-2522 <br /> Sportsplex Field House <br /> 3) Operating Impacts of Pool <br /> Mezzanine <br /> PURPOSE: To consider adopting criteria for selecting the design-build method of construction <br /> project delivery according to North Carolina General Statute (NCGS) 143-128.1.A, and approve <br /> the resolution upon the review of the County Attorney. <br /> BACKGROUND: In May 2013 the North Carolina General Assembly approved legislation that <br /> enabled the design-build method of construction project delivery method to be utilized by local <br /> governments without the passage of a Local Act by the Legislature. This type of procurement <br /> method allows an integrated design and construction entity to be selected by the County <br /> according to a qualifications based selection process (Request for Qualifications - "RFQ"). This <br /> selected individual, partnership, or firm would be engaged to deliver the project according to <br /> demonstrated experience and the construction, operating and budget specifications outlined in <br /> the RFQ solicitation. <br /> The design-build method is an integrated approach to a construction project that delivers both <br /> design (architectural and engineering) and construction services under one contract with a <br /> single point of responsibility, the Design Builder. Under this delivery method, the County would <br /> be provided the benefit of the design team and contractor working together to achieve the <br /> County's objectives under a single contract. That is, a designer and the contractor would <br /> partner or work for the same firm instead of both working separately for the County. <br /> The new design-build statute defines a design-builder as "an appropriately licensed person, <br /> corporation, or entity that, under a single contract, offers to provide or provides design services <br /> and general contracting services." The new statute still requires that architectural and <br />
The URL can be used to link to this page
Your browser does not support the video tag.