Browse
Search
Agenda - 09-15-2015 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-15-2015 - Regular Mtg.
>
Agenda - 09-15-2015 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2015 9:01:31 AM
Creation date
9/14/2015 8:16:48 AM
Metadata
Fields
Template:
BOCC
Date
9/15/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes 09-15-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> ORANGE COUNTY HEALTH DEPARTMENT FEE SCHEDULE <br /> ENVIRONMENTAL HEALTH <br /> Requested Fee <br /> Change for FY Last <br /> Description Current Fee 2015-16 Revision <br /> Environmental Health Soil Analysis/ImprovementPermit <br /> Single Family Units<600 Gallons per day. <br /> Less than 2 acres $390.00 2015 <br /> $390+$85 per 600 GPD or fraction of <br /> Single Family Units>600 Gallons per day additional WW flow>600 GPD 2015 <br /> Fee increases by 50%over the total permit fee <br /> Non-domestic WW of a comparably sized domestic WW system 2006 <br /> Authorization to construct WW system <br /> Single Family Units<600 Gallons per day. <br /> Less than 2 acres $290.00 2015 <br /> $290+$180 per 600 GPD or fraction of <br /> Single Family Units>600 Gallons per day additional WW flow>600 GPD 2015 <br /> Double fee for comparably sized domestic <br /> Non-domestic WW WW system 2006 <br /> Other Misc.Activities <br /> Improvement permit(lot w/existing home) $350.00 2006 <br /> Permit Site Revision $140.00 2015 <br /> Existing System Inspection $140.00 2015 <br /> Existing System Authorizations(Office <br /> authorization,no field visit required) $25.00 2015 <br /> Mobile Home Park <br /> 1 to 25 spaces $140.00 2015 <br /> 26 to 50 spaces $195.00 2015 <br /> 51 and over spaces $250.00 2015 <br /> ME Space Reinspection $85.00 2015 <br /> Septic Tank Manufacturer Yard Inspection $280.00 2015 <br /> Septic Tank Contractor Registration Fee- <br /> New contractor(one time) $225.00 2015 <br /> Septic Tank Contractor Fee-Annual <br /> Renewal $30.00 2015 <br /> Failed Inspection/Reinspection $40.00 2015 <br /> Septic Tank Contractor Education Class Fee 1 $50.00 2006 <br /> WTMP <br /> Initial inspection $140.00 2015 <br /> Follow-up inspection $85.00 2015 <br /> Wells and Water Samples <br /> Well permits $480.00 2015 <br /> Abandoned Well Permit Refund(if original Mr <br /> well abandoned within 30 days of <br /> construction) -$280.00 2015 <br /> Permit Site Review Revisions $140.00 2015 <br /> Microhiology <br /> Total Coliform P/A $60.00 2015 <br /> Total Coliform MPN $65.00 2015 <br /> Fecal Coliform $65.00 2015 <br /> Fecal Coliform/Streptococcus $85.00 2015 <br /> Enterococcus,MPN $65.00 2015 <br /> Iron Bacteria $65.00 2015 <br /> Sulfur/Sulfate-Reducing $75.00 2015 <br /> Pseudomonas-MTF or MPN $65.00 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.