Browse
Search
Agenda - 12-03-2007-6e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-03-2007
>
Agenda - 12-03-2007-6e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:50:42 PM
Creation date
8/28/2008 10:36:59 AM
Metadata
Fields
Template:
BOCC
Date
12/3/2007
Document Type
Agenda
Agenda Item
6e
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~a <br />DURHAM <br />CITY OF DURHAM <br />DEPARTMENT OF WATER MANAGEMENT <br />101 CITY HALL PLAZA • DURHAM, NC 27701 <br />919-560-4381•FAX 919-560-4479 <br />www.durhamnc.gov <br />18b9 <br />~aF <br />September S, 2007 <br />Mr. Ed Kerwin <br />Orange Water and Sewer Authority <br />400 Jones Ferry Road <br />Carrboro, North Cazolina 27710 <br />RE: Proposed Wastewater Transfer <br />Blenheim Woods Development <br />George King Rd. <br />Dear Ed, <br />Thank you for your continued support of OWASA accepting wastewater flow from Durham in <br />order to allow a potential development of a parcel of land on the west side of George King Road. <br />Mason Crum of your office related to us the question from, the OWASA board about whether or <br />not there would be any additional requests from Durham in the future. In studying our service area <br />boundary line we do not anticipate the need to make any more requests of this kind in the future. <br />As you know our service boundary lines runs from Cornwallis Road in the north to the southern <br />Durham County line. In the area south of NC 54 Durham already provides service to property <br />adjacent to the boundary line or the land separating the two service areas is owned by the US Army <br />Corps of Engineers. In the azea north of US 15-501 the land adjacent to the boundary line on the <br />Durham side is either already serviced by Durham or tributary. back towazds our system. For the <br />area between NC 54 and US 15-501 we currently provide service to all the property north of the <br />proposed development. The undeveloped land south of the development (see attachment) will <br />either be serviced by a future pump station located adjacent to Corps Property or by gravity to the <br />Celeste Circle Pump Station: <br />I will be able to attend the OWASA Board meeting on September 13'Y`. If you have any questions, <br />please contact me at your convenience. <br />Sincerely, <br />Donald F. Greeley, PE, PL <br />Deputy Director <br />Cc: Don Greeley, Water Management <br />Jim Harding, Water Management <br />John Greene, OWASA <br />Masan Crum, OWASA <br />Good Things Are Happening !n Durham <br />
The URL can be used to link to this page
Your browser does not support the video tag.