Browse
Search
Agenda - 12-03-2007-6d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-03-2007
>
Agenda - 12-03-2007-6d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:50:54 PM
Creation date
8/28/2008 10:36:57 AM
Metadata
Fields
Template:
BOCC
Date
12/3/2007
Document Type
Agenda
Agenda Item
6d
Document Relationships
2008-096 Purchasing - Coulter Jewel Thames Amendment to Agreement for Design of Northern Human Services Center
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />6.09 Permit Application Fzes. Site Plan Pees, Re-review l=ees <br />6.10 Environmental assessments other thfln 11'etlands Delineation <br />6.11 \1'etlandsiStream Disturbance Permitting <br />6.1_' Surveyin<~ <br />The L=ngineerin~z Consultant +vill not be responsible for or have. control or charge of construction means. <br />methods. techniques sequences or procedures or for safety precautions and programs in connection +cith the <br />work. and +vill not be responsible for the contractors failure to cam out the +vork in accordance +vith the <br />contract documents. The Engineering Consultant +vill not. be responsible fir or have control or charge over <br />the acts or omissions of the contractor, subcontractors or any other agents or employees or any other persons <br />performing any of the ++°ork. It~++~ill be the responsibility of the contractor to verif}' the depth and location of <br />all underground utilities prior to starting construction. Should any underground utility not be located as <br />shown on the dra+vings. the contractor will notifi~ the Engineering Consultant immediately before starting any <br />construction for a resolution of the discrepancy. The Engineering Consultant will be saved harmless from <br />any damaged utility during construction +vith the cost tilt repairing any underground utility borne by the <br />contractor. V <br />O~YNER RESPONSIBILITIES: <br />The Qwner+vill appoint a representative through which all communications with the Engineering Consultant <br />+vil) take place. The Engineering Consultant will be allowed access to the site at all times. The Owner ~+•ill . <br />be responsible far payment ol'any and all permit and application fees. The O++~ner will keep the Engineering <br />Consultant apprised of all relevant information that could affect the work. The O+vner will also be <br />responsible for any fees charged by utility locating services. "11te Owner shall also provide the Engineering <br />Consultant with a sealed professional survey of the sites. The Owner will be responsible for providing the <br />Engineering Consultant wvith flo+.v requirements for both pump station sites. The Owner will be responsible <br />for designing all .aspects of the sewer system not outlined to be desi_ned by the Engineering Consultant. The <br />O++-net will be responsible for permitting the sever system through Orange. County Environmental Health <br />and the State. The Owner will be responsible for all bidding, construction administration. and construction <br />observation. All design parameters will be provided by Orange County. <br />COM PENSAT(ON: <br />Compensation for basic services as outlined in the above scope of work will be provided fiir the stipulated <br />sums listed below plus reimbursable expenses as listed in the attached schedule. Additional Services will be <br />perforated as requested according to the hourly rate schedule. <br />1. Grinder Lift Station -------------------------------------------------- S 15,000.00 <br />2. Bff7uettt Lift Station ------------------------------------------------- $ 17,500.00 <br />3. Drafting Assistance ------------------------------ Hourly, estimate $ 15,000.00 <br />4. Site Plans ------------------------------------------ I-(ourly estimate $ 15,0'00.00 <br />5. Project Manual ----------------------------------- Hourly estimate $ 12.000.00 <br />Total Estimated Cost ----------____________._______________________ $ 74,.100.00 <br />(Includes estimate for hourly services for Items 3, 4, and 5) <br />Standard Hourly Rates <br />Licensed Professional Engineer ...............:................................................................ S 120AU/hour <br />l.iccnscd Professional Landscape Architeci ............................................................. ~ 1?U.00/hour <br />Licensed I'rolessional Consultant ............................................................................. $ 12U.OOlhour <br />Sur+~ev 1=field Crc+v .................................................................................................... $ 120.QUlhour <br />Engineer-in-•Crarniitg ................................................................................................. $ 8.00/hour <br />\utoCAU'1"cchnician ............................................................................................... $ 7U.OO/hour <br />5ecretm•ial ................................................................................................................. $ ±U.QO/hour <br />
The URL can be used to link to this page
Your browser does not support the video tag.