Orange County NC Website
<br />1.U3 Desi~~n of yard piping to connect the ne++r,rinder liR station to the existin~~ collection lines and <br />grease. traps that alloys fix t+vo e~isring septic tanks to he converted to grease traps. <br />1.04 Elecu•ical design for po++'er feed to new lift station and design of thr lift station instrumentation <br />and central systems. \o provisions will he made for emer_ency hack-up poser supply per <br />direction from Orvr~'e ~Otln[y. <br />?. Effluent Lift Station <br />_'.O1 Design of a new effluent lift station to be. located on the east side al' \C S6 to pump effluent <br />from the end of the treatment facility to the nitrification fields. The effluent lift station will be a <br />triples station with each pump delivering to a separate field. The wet +yell +a~ill he a precast <br />concrete vault. <br />03 Design of force mains to the nitrification tields.- <br />3.03 Design of sputter boles at the head of each nitrification field. <br />2.04 Electrical design Cor power feed to new lift station and design of the lift station instrumentation <br />and control systems. \n provisions will be made for back-up poser supply per direction from <br />Orange County. <br />3. Drafting Assistance for Other Portions of Project <br />3.01 Provide drafting assistance to Orange County to support their design efforts for the remaining <br />portions of the Project. Drafting and assistance will be provided to Orange County as directed <br />by the Orange County Engineer. 4 <br />4. .Site Plans <br />4.01 Prepare site plan drawings and applications for improvements on the east and y+~est sides of ~C <br />86 for review and approval by the Orange County Planning Department as directed by the <br />Orange County Ertgineer. <br />4.03 Meet with the Orange County Planning Department as required for review and approval of the <br />site plans. <br />4.03 Make revisions as required to the site plan drawings. <br />S. Project i1'tanuat <br />5.01 Assist the Orange County Engineer with the preparation of a project manual by developeing <br />contract documents and assembling bid packages as directed. <br />6. Additional Services not included in Basic Scope of Services, which can he performed at the <br />direction of the Owner <br />6.D I Permitting of the septic system. All permitting will be done by the Owner. <br />G.0? Bidding phase services <br />6.03 Construction obsen~ation, as-boil! dra++~ings, or construction administration. <br />6.04 Re-designs authorized by the O~yner after plans have Been accepted by the O+cncr. <br />G.OS Re-designs due to unkno+vn or unanticipated field problems including. but not limited to <br />unsuitable soil and undiscorered utilities. <br />(i.06 Lahoratory testin~~ of materials, borings. and specialized geolcr,_*ical studies <br />6.07 Assistance in negotiating I'or land and eascanent rights. <br />6.OS Construction stake-out of any site features or details <br />