Browse
Search
Agenda - 12-03-2007-6d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 12-03-2007
>
Agenda - 12-03-2007-6d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:50:54 PM
Creation date
8/28/2008 10:36:57 AM
Metadata
Fields
Template:
BOCC
Date
12/3/2007
Document Type
Agenda
Agenda Item
6d
Document Relationships
2008-096 Purchasing - Coulter Jewel Thames Amendment to Agreement for Design of Northern Human Services Center
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Cou4ter Jewell Thames. ~~~. <br />.: t 'J '- <br />l.E"{`1'ER OF .aC;REE1~ll/\'T <br />made this 9"' day ol'November. 2007 <br />l"o "Che C?~1:\L'{2 ,GNU LE:1U UES{GNE12 <br />C)ran~e County <br />PQ (30~ 81 fi 1 <br />i-{illsborou<.th. NC 27274 <br />Bv'{'hc E1G{tiEER1NG CONS{.!L"C,~lti'i' <br />Coulter Jewel{ Thames. P..a. <br />1 I 1 }~Vesf iv4ain Street <br />Durham. North Carolina 2770 <br />For Cir•il Engineering Consulting Serrices <br />To assist Orange County with the design of an on-site sanitary seta-er treatment system to sense die Northern <br />Human Services Center located north of Nilisborou~h nn 1\:C SCi. <br />Ucscription <br />This praposal is fir Civil Engineering sen~ices related to the design and drafting of various components a!''a <br />sanitary server treatment system to serve the Narthern 1-luman Services Ce.nter.yOran~e County has <br />developed a conceptual and process design for the septic system. The major components of the new sewer <br />s}•ste+n includes a grinder sewage lift station and force main to pump sewage co the new treatment. Iacility to <br />be located on the east. side of NC 4h, a sewer treatment facility, an effluent lift statian, and riitrificatian. fields <br />This proposal is for Coulter Jewel( Thames to design specific pumping and piping components of the overall <br />s_ystean and to provide drafting and other assistance for other portions of the project performed by Orange <br />County. Design work performed by Coulter Jewell Thames P.A. will include engineering drawings and <br />technical specifiratians for assembly by Orange County into the Contract Documents. Coulter Jewell <br />Thames will assemble or assist with assembly of the. b'td package and contract documen s as directed by <br />Oran~~e County. tt is understood that this "Agreement" holds harmless Coultec Jewell Thames, P.,a. of any <br />responsibility relative to the process and treatment of water-water being performed by the on-sste sanitary <br />sewer treatment faciiit;~ that ta~ill serve the l~torthern Husnan Services Center. Process design and associated <br />kinetics and the quality oftreatment of the tt~astewater for the Northe+-n Hutrian Services Center will he the <br />sole responsibility of Orange County. <br />SCOPE OF BAS{C SERV{CES: <br />t. Grimier Lift Station <br />i.01 Design of a ne"~ grinder lift station in the rear of the Northern Human Services Center to pump <br />sewa~~e to the east. side of NC 86. It'space does not allo~a~ construction of a new lift. station. <br />design will include caiversion of the existin;~ eflluettt pump tank to the new ~:trindcr lift statian. <br />!.0? {)esign of a new force main to cross l~'C 8G and that will discharge at Che head ol'thr treattent <br />tiuility on the east side at NC' Sti. <br />
The URL can be used to link to this page
Your browser does not support the video tag.