Orange County NC Website
(Excerpt of Section 6.23.3) <br />2. Non-Residential Development <br />Amended 1/4/94: 10/19/99: 8/21/01 <br />Attachment 1 13 <br />DISTRICT IMPERVIOUS SURFACE/DETENTION POND REQUIREMENTS <br /> (NON-RESIDENTIAL) <br />UNIV-CA Same as Residential (See previous Table) <br />UNIV-PW <br />CANE-CA 5-acre minimum lot size, with potential of up to five lots as small as <br /> two acres for lots of record October 19, 1999 (Amended 10-19-99); <br /> AND <br /> 6% impervious surface limit. <br /> * BMPs cannot be used to satisfy watershed impervious surface <br /> requirements. <br />U-ENO-CA 2-acre minimum lot size <br /> AND <br /> 6% impervious surface limit. <br /> * BMPs cannot be used to satisfy watershed impervious surface <br /> re uirements. <br />CANE-PW 5-acre minimum lot size with potential of up to five lots as small as <br /> two acres for lots of record October 19, 1999 (Amended 10-19-99); <br /> AND <br /> 50% ISR for all fire stations and solid waste collection centers; <br /> AND <br /> 12% ISR for all other non-residential uses; <br /> AND <br /> on-site infiltration of the first inch of stormwater runoff; <br /> AND <br /> a limit of 1.0% of the watershed for non-residential use (139 acres <br /> in CANE-PV1n. <br /> * BMPs cannot be used to satisfy watershed impervious surface <br /> requirements. <br />LITTLE-PW 2-acre minimum lot size <br /> AND <br /> 50% ISR for all fire stations and solid waste collection centers; <br /> AND <br /> 12% ISR for all other non-residential uses; <br /> AND <br /> on-site infiltration of the first inch of stormwater runoff; <br /> AND <br /> a limit of 1:0% of the watershed for non-residential use (139 acres <br /> in CANE-PV1n. <br /> * BMPs cannot be used to satisfy watershed impervious surface <br /> re uirements. <br />* BMP's as mandated by the stormwater Management Program for Lands within the Neuse River Basin are allowed. <br />