Orange County NC Website
A motion was made by Commissioner Rich, seconded by Commissioner Pelissier for <br /> the Board to approve the interlocal agreement for the development and operation of the <br /> planned Hollow Rock Nature Park, to add the word "ethnicity" to Item III (Site Management), to <br /> authorize the Chair to sign the agreement, and to authorize staff to make any non-substantive <br /> changes that may be necessary prior to execution. <br /> VOTE: UNANIMOUS <br /> b. Eubanks Road Solid Waste Convenience Center Construction <br /> The Board considered: 1) Authorizing staff to move forward with bid document <br /> preparation and bidding of the Eubanks Road Convenience Center site <br /> expansion/improvement project in order that work can be initiated at the earliest possible time <br /> during the summer and fall months of 2015; 2) Authorizing the Manager to award the bid and, <br /> upon County Attorney review, execute the construction contract for the Solid Waste <br /> Convenience Center expansion/improvements during the summer break in an amount not to <br /> exceed the project budget; and 3) Authorizing the Manager to approve project change orders <br /> that do not in total exceed the project budget. <br /> Gayle Wilson, Orange County Solid Waste Director, said at a recent Solid Waste <br /> Advisory Board (SWAB) meeting a more accurate title was suggested for this project: <br /> Eubanks Road Convenience Center, Scale Operations and Landfill Entranceway <br /> Improvements. <br /> Gayle Wilson said this evening he would: brief the Board on the project; review the <br /> planned improvements; review the project evolution; provide an overview of the estimated <br /> schedule; explain the proposed temporary center that will function during construction; make <br /> comments regarding some perceived duplication of services; answer questions; and hoped to <br /> gain authorization from the Board for the Manager to award the construction bid and sign the <br /> contract during summer break. <br /> Gayle Wilson referred to the site plan and said he would walk the Board through the <br /> project. He pointed out that the new location entrance will also serve as the exit. He said <br /> there will be 3 Municipal Solid Waste (MSW) compactors along with cardboard and mixed <br /> recyclables compactors. He said there will be dual level containers. He said the lower level of <br /> the Center will have tire, clean metal, clean wood, yard waste, bulky item, and rigid plastics <br /> collection. <br /> Gayle Wilson said the site will be much safer including some ADA improvements such <br /> as a paved service and lower loading heights. He said this site will operate more efficiently, <br /> have reduced odors and be a cleaner site with better working conditions for staff. He said <br /> there is a but in front of the central MSW compactor for staff. He said this but is enclosed with <br /> heating and air conditioning while the other compactors have canopies over them. He said <br /> there is also a bathroom and running water in the scale house which no other center has <br /> except Walnut Grove. He said if someone is going to the landfill then one would proceed <br /> straight in through the property into the landfill area. He said the new scales and scale house <br /> would be located here. He said there is a return road if vehicles need to weigh back out to <br /> calculate their fee. He said there is also a sanitation vehicle parking area on the perimeter of <br /> the property. He said the newly proposed services are: textiles, plastic film, food waste, <br /> cooking oil, an expanded salvage shed and a hazardous waste service. <br /> Gayle Wilson said this center was originally planned to mirror the one at Walnut Grove <br /> at an anticipated cost of$1.4 million. He said the manager proposed that the project be <br /> revised to include the entire Eubanks Waste Facility Entrance Way and Scale Operations, <br /> moving to the north of Eubanks road, and to include the incorporation of a hazardous waste <br />