Browse
Search
Minutes 05-26-2015
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2015
>
Minutes 05-26-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 8:59:10 AM
Creation date
9/2/2015 8:33:59 AM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 05-26-2015 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Agenda - 05-26-2015 - C-1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Agenda - 05-26-2015 - C-2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Agenda - 05-26-2015 - C-3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Agenda - 05-26-2015 - C-4
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Agenda - 05-26-2015 - C-5
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Agenda - 05-26-2015 - C-6
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Held in a quasi-judicial format meaning all parties, for and against the application, <br /> provide sworn testimony as well as competent material and substantial evidence on the <br /> merits of the proposal. <br /> • Applicant has burden of demonstrating project complies with the provisions of the UDO. <br /> • Anyone opposing the application is required to demonstrate through sworn testimony as <br /> well as competent material and substantial evidence that the project does not comply <br /> with the provisions of the Ordinance. <br /> • Hearsay and/or unsubstantiated opinions are not considered sufficient testimony. <br /> • If applicant proves compliance with applicable standards, and there is no evidence in the <br /> record the project does not comply, the SUP must be issued. <br /> REQUEST <br /> • Erect individual solar array panels on approximately 20 acres of property. <br /> • Typical array is between 7 and 9 feet in height, with approximately 2 to 3 feet of ground. <br /> clearance, and approximately 63 feet in length. <br /> • Arrays will be screened by an installed 50 ft. wide Type D Land Use Buffer. <br /> • An 8 foot high chain link security fence shall surround the perimeter of the 11.5 solar <br /> array field, outside of the proposed land use buffer, to prevent access. <br /> • Gravel paths/drives will be installed around these arrays in order to permit access by <br /> technicians to service the panels. Depending on the soil and topography, areas around <br /> the solar panels will be a combination of natural groundcover, grassed, and/or paths. <br /> • Vehicular access to the site is restricted by a 24 foot wide drive with gated access via <br /> White Cross Road. <br /> SITE PLAN <br /> • Cross Section of Northern Property Line <br /> SITE PHOTO— NORTHERN PROPERTY <br /> SITE PHOTO—WHITE CROSS REC PROPERTY <br /> SITE PHOTO— UTILITY SUBSTATION <br /> SITE PHOTO— PROPERTY FROM OLD GREENSBORO ROAD <br /> NEIGHBORHOOD INFORMATION MEETING <br /> • Held on April 9, 2015, <br /> • Adjacent property owners expressed concern over impacts on their property values, <br /> • The northern property owner expressed concern required land use buffers were <br /> insufficient, <br /> • Adjacent property owners expressed concerns over traffic and access to the facility, <br /> • There were concerns over what was going to happen the rest of the property (i.e. how <br /> would it be developed/redeveloped). <br /> REVIEW PROCESS <br /> • Step One: Review of application at a joint Quarterly Public Hearing by BOCC and <br /> Planning Board. BOCC adjourns the public hearing to a date/time certain to receive the <br /> Planning Board recommendation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.