Browse
Search
Minutes 05-14-2015
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2015
>
Minutes 05-14-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 8:21:14 AM
Creation date
9/2/2015 8:20:06 AM
Metadata
Fields
Template:
BOCC
Date
5/14/2015
Meeting Type
Budget Sessions
Document Type
Minutes
Document Relationships
Agenda - 05-14-2015 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-14-2015 - Budget Work Session
Agenda - 05-14-2015 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-14-2015 - Budget Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Price asked if the preceding pages of the CIP, prior to page 26, were <br /> going to be discussed. <br /> Paul Laughton said the previous pages were discussed at the April 9 meeting; <br /> however, there would be time to go back to those pages at the end of this evening's meeting. <br /> He said this will be one of the last detailed work sessions regarding the CIP, and now is the <br /> time for the Board to offer any direction, suggest changes or revisions, and pose questions so <br /> staff can get answers. <br /> Bonnie Hammersley said the CIP will be part of the process during budget hearings, <br /> with goal of keeping the CIP as a part of the conversation about the operating budget. <br /> Roofing Projects (CIP page 27) <br /> Paul Laughton said there are two roofing projects in Year 1, followed by a scattering of <br /> projects over the next four years. He said Year 1 includes a project at the Jail and the Old <br /> Courthouse. He said Years 6 through 10 include a lot of projects. He said roofing needs <br /> consistently change from year to year, and the Roof Asset Management Program (RAMP) <br /> continually reviews the conditions of roofs, along with cost estimates. <br /> Commissioner Jacobs asked if roof gardens are going to be incorporated. <br /> Jeff Thompson said yes. He said there are two considerations: structural and the cost <br /> benefits of those technologies. He said the idea was considered at Cedar Grove, where solar <br /> is also being considered. He said the Hillsborough Commons Project was also considered. <br /> Commissioner Jacobs asked if rooftop gardens will be considered on new construction <br /> projects, such as the Jail or Southern Human Services Center expansion. <br /> Jeff Thompson said the Jail is a compelling point. <br /> Commissioner Rich said the Sheriff did mention wanting a garden, in which the inmates <br /> could work and grow food. <br /> Commissioner Price said the Skills Development Center and the Visitors Bureau at 501 <br /> and 503 W. Franklin Street have $51,700 allotted in Year 3 and a $209,800 in Years 6 through <br /> 10. She asked if the purpose of these monies could be explained. <br /> Jeff Thompson said the monies are for the roof on the Visitor's Bureau, which has <br /> multiple roofs, and the funding is spread out over time to address the needs. <br /> Commissioner Rich asked if the monies and plans would shift if the location of the <br /> Visitor's Bureau changed. <br /> Jeff Thompson said even if the Visitor's Bureau moves, the new occupant of the 501 W <br /> Franklin Street property will still need a new roof. He said if the property is divested, or <br /> changes hands, the needs of the roof will be considered in that transaction. <br /> Commissioner Jacobs asked if the structural integrity of the old Chapel Hill Town Hall <br /> has been investigated. <br /> Jeff Thompson said there have been preliminary studies done on both the old Library <br /> and the old Town Hall. He said he would share this information with the Board prior to the <br /> summer break. <br /> Information Technology (IT) (CIP page 28) <br /> Paul Laughton said there is a total of$500,000 put in for infrastructure, with $50,000 of <br /> that total set aside for the Board of County Commissioners' initiatives. He said there is <br /> ongoing review of all equipment to assess the need for repair or replacement. He said the <br /> final financing of the Central Permit item should be added into the IT capital. <br /> Commissioner Jacobs asked if the County plans to continue using desktop computers, <br /> or will there be a switch to more laptop computers, as previously predicted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.