Browse
Search
Agenda - 09-08-2015 - C3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-08-2015 - Quarterly Public Hearing
>
Agenda - 09-08-2015 - C3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2015 12:07:23 PM
Creation date
8/31/2015 10:23:27 AM
Metadata
Fields
Template:
BOCC
Date
9/8/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.3
Document Relationships
Minutes 09-08-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 84 <br /> Section 5.5: Standards for Residential Uses <br /> (e) A statement for setting forth the length of tim/heeq e request i <br /> made. Approval shall not exceed one year. <br /> (2) Standards of Evaluation <br /> (a) The relationship between the occupants of tily it and the <br /> mobile home is established. <br /> (b) There is a certificate from a licensed physicig the necessity <br /> of direct care. <br /> (c) The floor plan of the existing single family ue is no reasonable alternative to the mobile home. <br /> Th e proposed site plan shows the location a f the existing <br /> single family unit, the mobile home, and dr. eways and parking areas. <br /> The setbacks for all structures meet or ceed the requirements of the <br /> strict in which the lot is located. <br /> (e) Th e shall be adequate lot area fo each unit, according to the minimum <br /> requi ments of the zoning distri in which the lot is located. <br /> (f) Approva f the Orange Coun Health Department for water and <br /> sewerage 'sposal facilities or the approval of the appropriate agency <br /> from which s itary sew e and water will be supplied. <br /> (g) Approval of the plic ion shall not exceed one year. Renewal shall <br /> constitute a new a ication. <br /> 5.4.5 Buildings for Temporary Use <br /> (A) Standards for Class B Spe ial Use Per 't <br /> (1) Submittal Reclu' ements— <br /> In addition to e information required b ection 2.7, the following information <br /> shall be su lied as part of the application r approval of this use: <br /> (a) ite plan showing all existing and pro osed structures on the site, <br /> existing and proposed topography at a ntour interval of five feet, <br /> existing and proposed landscaping, parki areas, access points, any <br /> officially designated flood plains, and other "te details. <br /> (b) A description of the exterior materials, color an construction details. <br /> (c) Statement of proposed use and length of time bui 'ng will be in use. <br /> Standards of Evaluation— <br /> (a) The temporary building shall not be used for residential rposes. <br /> (b) The temporary building shall not be used by operations offe i g drive-in <br /> services. <br /> (c) The use of the building shall be only for the period of time specifi and <br /> for the use specified. <br /> (d) The proposed use is a permitted use in the district in which it is locate <br /> SECTION • ' RESIDENTIAL USES <br /> 5.5.1 Accessory Structures and Uses <br /> (A) General Standards of Evaluation <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.