Orange County NC Website
57 <br /> REQUIREMENT UDO SUPPORTING EVIDENCE Planning BOCC <br /> Board <br /> Section 5.3.2 Application package and The <br /> The location and character of the (A) (2) (c) testimony including: location <br /> use, if developed according to the and <br /> plan submitted, (will /will not) be licensed George professional a character <br /> in harmony with the area in which it licensed professional of the <br /> is to be located and the use is in engineer, use, if <br /> compliance with the plan for the . Mr. Thomas Hester a develope <br /> physical development of the licensed real estate d <br /> County as embodied in these appraiser, according <br /> regulations or in the to the <br /> Comprehensive Plan, or portion • Mr. Richard Kirkland a plan <br /> thereof, adopted by the Board of licensed real estate submitted <br /> County Commissioners. appraiser, will be in <br /> • Mr. Richard Moretz a site harmony <br /> developer with Cypress <br /> Creek Renewables LLC and <br /> its subsidiary White Cross <br /> Solar LLC, and Mr. <br /> • Thomas Cleveland a <br /> licensed professional <br /> engineer, <br /> on how the project complied <br /> with the UDO as well as the <br /> submitted site plan. <br /> Staff testimony and abstract <br /> package from May 26, 2015 <br /> quarterly public hearing. <br /> Planning Board packet from July <br /> 1, 2015 regular meeting. <br /> A lack of competent material <br /> evidence in the record <br /> demonstrating the applicant did <br /> not comply with the UDO. <br />