Orange County NC Website
53 <br /> REQUIREMENT UDO SUPPORTING EVIDENCE Planning BOCC <br /> Board <br /> STANDARDS for Solar Array— Public Utility <br /> Site Plan 5.9.6 (C) (1) Application, Applicant Yes <br /> A site plan prepared in (a) through Testimony, Staff Testimony, and <br /> accordance with Section 2.5 of (d) Site plan. <br /> and 5.9.6 (C) (1) inclusive of Site plan provides elevations for <br /> UDO proposed arrays, detailed <br /> landscape plans (Sheet(s) <br /> C1001 and 1002). The <br /> application contains required <br /> soils report (Attachment 1 of <br /> May 26, 2015 quarterly public <br /> hearing package). <br /> Standards of Evaluation <br /> 5.9.6 (C) (2) Application, Applicant Yes <br /> On-site utility and transmission (a) Testimony, Staff Testimony, and <br /> lines placed underground when Site plan (Sheet C1001 — Note <br /> feasible 19) <br /> 5.9.6 (C) (2) Application, Applicant Yes <br /> Height of array shall not exceed (b) Testimony, Staff Testimony, and <br /> 40 ft. Site plan (Sheet C1001) <br /> 5.9.6 (C) (2) Application, Applicant Yes <br /> Individual arrays shall be (c) Testimony, Staff Testimony, and <br /> designed and located to prevent Site plan (Sheet C1001 — Note <br /> reflective glare toward inhabited 20) <br /> buildings on adjacent property <br /> and rights-of-way. <br /> Warning signs concerning 5.9.6 (C) (2) Application, Applicant Yes <br /> voltage. (d) Testimony, Staff Testimony, and <br /> Site plan (Sheet C1001 — Note <br /> 15) <br /> Mechanical equipment and 5.9.6 (C) (2) Application, Applicant Yes <br /> arrays shall be enclosed by a (e) Testimony, Staff Testimony, and <br /> minimum 8 ft. high fence and Site plan (Sheets C1001 and <br /> screening per Section 6.8 of 1002) <br /> UDO. <br /> Proof of liability insurance — 5.9.6 (C) (2) Application and Applicant Yes <br /> minimum of$500,000.00 per (f) Testimony <br /> occurrence. <br />