Browse
Search
Agenda - 09-01-2015 - 5b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-01-2015 - Regular Mtg.
>
Agenda - 09-01-2015 - 5b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 10:01:53 AM
Creation date
8/31/2015 9:58:39 AM
Metadata
Fields
Template:
BOCC
Date
9/1/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5b
Document Relationships
2016-198 Planning - White Cross Solar LLC and William and Carol Byron - Special Use Permit
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
2016-198 Planning - White Cross Solar LLC and William and Carol Byron - Special Use Permit
(Linked From)
Path:
\Board of County Commissioners\Various Documents\2010 - 2019\2016
Minutes 09-01-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
53 <br /> REQUIREMENT UDO SUPPORTING EVIDENCE Planning BOCC <br /> Board <br /> STANDARDS for Solar Array— Public Utility <br /> Site Plan 5.9.6 (C) (1) Application, Applicant Yes <br /> A site plan prepared in (a) through Testimony, Staff Testimony, and <br /> accordance with Section 2.5 of (d) Site plan. <br /> and 5.9.6 (C) (1) inclusive of Site plan provides elevations for <br /> UDO proposed arrays, detailed <br /> landscape plans (Sheet(s) <br /> C1001 and 1002). The <br /> application contains required <br /> soils report (Attachment 1 of <br /> May 26, 2015 quarterly public <br /> hearing package). <br /> Standards of Evaluation <br /> 5.9.6 (C) (2) Application, Applicant Yes <br /> On-site utility and transmission (a) Testimony, Staff Testimony, and <br /> lines placed underground when Site plan (Sheet C1001 — Note <br /> feasible 19) <br /> 5.9.6 (C) (2) Application, Applicant Yes <br /> Height of array shall not exceed (b) Testimony, Staff Testimony, and <br /> 40 ft. Site plan (Sheet C1001) <br /> 5.9.6 (C) (2) Application, Applicant Yes <br /> Individual arrays shall be (c) Testimony, Staff Testimony, and <br /> designed and located to prevent Site plan (Sheet C1001 — Note <br /> reflective glare toward inhabited 20) <br /> buildings on adjacent property <br /> and rights-of-way. <br /> Warning signs concerning 5.9.6 (C) (2) Application, Applicant Yes <br /> voltage. (d) Testimony, Staff Testimony, and <br /> Site plan (Sheet C1001 — Note <br /> 15) <br /> Mechanical equipment and 5.9.6 (C) (2) Application, Applicant Yes <br /> arrays shall be enclosed by a (e) Testimony, Staff Testimony, and <br /> minimum 8 ft. high fence and Site plan (Sheets C1001 and <br /> screening per Section 6.8 of 1002) <br /> UDO. <br /> Proof of liability insurance — 5.9.6 (C) (2) Application and Applicant Yes <br /> minimum of$500,000.00 per (f) Testimony <br /> occurrence. <br />
The URL can be used to link to this page
Your browser does not support the video tag.