Orange County NC Website
29 <br /> REQUIREMENT UDO SUPPORTING EVIDENCE Staff Planning <br /> Board <br /> STANDARDS for Solar Array— Public Utility (continued) <br /> Decommissioning of solar facility 5.9.6 (C) (3) Application, Applicant Testimony, Yes <br /> (a) through Staff Testimony, and Site plan <br /> (f) inclusive (Sheet C1001 — Note 21). <br /> Applicant acknowledges <br /> requirement and agreed to the <br /> condition in the event the use of <br /> the site as a solar array — public <br /> utility is ceased. <br />