Browse
Search
Agenda - 09-01-2015 - 5b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-01-2015 - Regular Mtg.
>
Agenda - 09-01-2015 - 5b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 10:01:53 AM
Creation date
8/31/2015 9:58:39 AM
Metadata
Fields
Template:
BOCC
Date
9/1/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5b
Document Relationships
2016-198 Planning - White Cross Solar LLC and William and Carol Byron - Special Use Permit
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
2016-198 Planning - White Cross Solar LLC and William and Carol Byron - Special Use Permit
(Linked From)
Path:
\Board of County Commissioners\Various Documents\2010 - 2019\2016
Minutes 09-01-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br /> _. ...... . ._...W..... . . Projecta*itimber, 15-0536__ DL Date 5/25/2015 OR A Normal Process Time - <br /> __ {stanttor}bale iuxn] <br /> PFRMIT'S SPECIAL. PROC'F-Dl.IRFSnrR6C UIRi'.R'ENT'S <br /> File surety'bond ot'S5,000���ith G'NR running to slate OFNC Conditional that anv well 10 days <br /> ❑ Permit to drill exploratory oil nr gas well opened by ddh operator shall,upon ahandomncn(,be plugged according io F.NK rules hi!A <br /> and regulations. <br /> Application filed with E t at least 10 I)rio to issue or permit. Application be] 16 days <br /> Geophvsical Exploration Pelniit <br /> letter.No stan&rd application Farm. NIA <br /> ❑ Application roe based on structure sire is charged.Musl include descriptions&' i 15-20 days <br /> State Lakes C.otrsttuciion Perrsrit <br /> (trasvatgs a1 str7arttzte Y t)Lroofoi'oxrVttership ofripariara lrrolxrty, N1;A <br /> ❑ - 60 day's -- <br /> 401 W.ticr(ual#ty Certi ficai un NIA (7 30 days) <br /> S)d vs <br /> CAMA pt5rmit for NIMORdevelo pent � S2�0.00 lee must aceonipany appfication <br /> t {i5fl days) <br /> 7?da}'ti <br /> CWMA I'crnrid tit A,IliJE,)l2 tie.1'elopnreni. S50.0(1 fee must acconrparty aplrliaation <br /> Several geodc(ic monutttcnis ate located ill of acar the project area.if ary mmiumem reeds to he moved or destroyed,please nohr <br /> ti.C.Geodetic Survey,Box 27647 Raleigh,NC"2761 i <br /> II <br /> Abandonment ol'any wclls,ifvequircd musl be in accordance at hh'l ittc 15A.Subchapier 2C AIM <br /> ® Notiticaiion of"the proper regimal otTice is requested if"orphan"undergrouml s!orage tanks(UST':S)are discovered during any exuvaadon operatiexr. da <br /> ❑ C.'omplianee with 15A.NCAC'2I 1100D(C[�sstal Stomiwaitr I ICS)is recluircd. 45 PA) <br /> (N.i) <br /> ❑ t',':alawba,Jordan Lake,Randaiman, Pita Pa mlieo or Neusc.Riparian t.3nlfer Ruics required. <br /> Plans and specifications foi the casasltttcGon,expatraion,ar ailcraltvn of at public watey system must he approved toy the€ivisiion of 11',mi <br /> R4sourceyil'uh4ic hater snpply Section prior to they award of a eonlfael or the initiation of construction as per ISIS NCA('I SC.0300 et.seq.Plans:and <br /> spectCcationsshould be submitted W 1631 Mail Scrvicv Center,z?vigb,Noitri Catolina 27699-16384. All public wales salary systems must comply 30 days <br /> with stale and federal tlrinkingwaterinoniioiinz requirements.Foa more inrormation,costsCT the Public WatcrSupj*Scciion,(919)707-9100. <br /> ft c gisting w ater lines will be r6ocatrd daring the construction,plans Vor the water line relocation must IV suhrnitted to the Division of S:'aier <br /> Rcsource511'ubbc water Supply Sectiw at 1634 Mail Service Center,Raleigh,North Carolina 27599'-1034.For mort,information,,contact the Public 30 days <br /> Watcrr Sttppiy Seetion,019)707-9100. <br /> C3titcr coutntents(auaeh ad titionu'pages a-neeessary,heing cmain to cite cominetft actthority) <br /> Division � tnitlals No Comments ( Date <br /> i <br /> comment Review <br /> QAQ ddtm ❑ 5/15/35 <br /> DWR-WQRC35 E ds ❑ YN 5/27/15 <br /> (Aquifer&Surface);; rb ❑ 5J28{75 <br /> DWR-PWS N/A <br /> DEMLR(LQ&5W) JLH ❑ This site appears to be addressed appropriately udder the local ordinance, j 5/2.2./15 <br /> _DE <br /> -UST MRP ❑ Notify the UST Section at the Raleigh Regional Office if petroleum- ! 5/26/15 I <br /> f <br /> contaminated soil or groundwater is encountered during construction, <br /> REGIONAL OFFICE <br /> Questiotis regardirfc,these perniits should be addressed to the Regional Office marked below. <br /> ❑ Asheville Regional Office ❑ Mooresville Regional Office ❑Wilriihigton Regional Office <br /> 2090 CIS Highway 70 610 East Center Avenue, Suite 301. 127 Cardinal Drive Extension <br /> Swannanoa,NC 28778 Mooresville,NC 28115 Wilmington,NC 28405 <br /> (928)296-4500 (704) 663-1699 (910)796-72 t5 <br /> ❑ Fayetteville Regional Office Raleiglit Regional Office ❑Winston-Salem Regiafial Office <br /> 225 North Green Street,Suite 714 3800 Bane€t[)five,Suite 101 450 West Manes Mill Road,Suite 300 <br /> l avetteville,NC 28301-5043 Rateigh,NC;27609 Winston-Salem, NC"27105 <br /> ( 910)433-3300 (913)791-4200 (336)771-9800 <br /> ❑Washington Regiollial Office <br /> 943 Was hingtou Square Mall <br /> Washington,NC 27889 <br /> (252)946-6481 <br /> February I I,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.