State of North Carolina Reviewing Office: RRO
<br /> 19
<br /> Department of El nviromnem and Natural Resources
<br /> 'A'L R F -Prqject Number 15-0596 . Due Date:,5/2,5/2015,
<br /> INTL,RGOVERNIVIEN'T ;VIE,W,-�PROTFCl'-COMiAI,117,,NT,�fS
<br /> County ORANGE
<br /> Allier vcMcw of ibis projmt a..has been clocrinined that the EN It licimit(s)ancVorapprovals indicated may riccd to be obtained in order for this project to comirly with
<br /> North Carolina Ultv.Quvslions rcgardjmg these pens its should he addressed to the Regional Office indicated on the reverse ofthe k)mi.Ali applications,information
<br /> and guidelines relative tot these pLim and ficimits ive available(ron)the same Regional Office.
<br /> Norma!Process"fibre
<br /> PERMITS
<br /> SPCC[f.APP[JCtV1'K)N, PROCEDURES or REQUIRENIFNTS (stamlory time limit)
<br /> 11crink,io coiistruri&operate waszewaler facilities,
<br /> Applica(ioTi 90 days.before 6cgin consiruction of-award of cousiruction 30 days
<br /> ,cwc,systein emcmiorts&qckve syswmq not discharging
<br /> contracts Oil-site mspcciion�Poil-applie'lli(ITI technical Conference ti.qual. (90 days)
<br /> into slate surface wal��m
<br /> Nl')VS-permiL to dischuge vo siirface wam andfot- Applicalk)I IS0 dilys K'Iorc be"M a0ijVily.()FI-9iC h)SjCC00Dr I'm-
<br /> application coni'mace astrat.Additionally,obtain permit to cointruel 90-1_0(lays
<br /> El pcimii to gate and conmict tvasiewater facilities
<br /> wastewaler Ircainicot faciliTy-gramed after NJ IDES.Reply time,30 days alierg (NYA)
<br /> discharging into state sorfiac wxcvs
<br /> receipt ofplans or issue or NPD[-'S pmnit-whichever is later
<br /> 30 days
<br /> Water Use Permit
<br /> Pre-application technical conference irstially necessary
<br /> (NTIA)
<br /> Wet I construcl ion pelmlit.
<br /> Coarp4ew application must be ioceived and Ivi-nin issued prior to the 7 days
<br /> installation of a well. {IS days)
<br /> Application copy musr be served on cach adjacent riparian property ownet".
<br /> On-site inspection.Pro-applicator coriltrence usual.Filling may Te(JUITe 55 days
<br /> I)redgeall(I Fill 11crildi
<br /> Hasonlom to FM from N.C..I)CI)XIIII011.of Adir ini5iralion and 190 days)
<br /> Federal Drozige and Fill Permit.
<br /> ApplicaOon must be submitted and permit reccked prior to
<br /> Permit it)construe! opera.te Air Flolludon Abatemmu constroction and operation ofth��source. 11'a perrtiji is rcqu;red in at,,
<br /> lkilitit�sand!or Fmission Sonrices,as per 15 A NCAC 90 days
<br /> area withoul local mning,then are addilionul and
<br /> 1hru 2Q,0300)
<br /> timelines(2Q,01333.
<br /> ITIM&Qpt;ate]lansport"'lion Fa6lity a",pci Application must be 3Libnlit'Od W least 90 days I)rI01 to COMUTIClioll
<br /> El 1151��Aln'�to cons 90 days
<br /> NCAC(2 D.0800,2Q,(1601 or modification of source.
<br /> Airy open huming associated with subject proposal rlusf be
<br /> in compliance with 15 A NCAC 21).19U0
<br /> Demolition or renovations of structures containing asbestos
<br /> Maim ial rintist he in compliance with 15 A NCAC 20.1110 60 days
<br /> ,al(I)-,vliicli requires poifficafion and removal prior to NIA (CIO days)
<br /> t1cm,i!i6on.Contact Asb ,tol,Control Group 919-707-5950.
<br /> Complex Source Pcmi4 required 11TI&F I S A NCAC
<br /> El 21msoo
<br /> Conlrot Act of 1973 mast be properly addressed for arty land distiirbing.aesivily.An erosion&sulimentntion
<br /> control plan will be re aired if or more acres to be disimlx�d Plan ClIed with proper Regional Office(LArld Quakly Scclion)At leasi.30
<br /> -0 days
<br /> days before beginning activity.A fee or$65 for the first time or any pan ofan acre. An express review option is avaitable With additional (3G days)
<br /> Cces.
<br /> ❑ Sedimentation and erasion coatial mum be addiessed in accordance wi0i N< 01's approved program, Particular attention should be given (30 days)
<br /> fn design and installation ufappropjimc tievinivicr sc6awni trapping devices as well as stable-
<br /> .,tortljWaTejL conveyances and outle(s.
<br /> Can site inspection usual.Surety bond fled with FNR Bond amount%,,]ties
<br /> with tyi)c mine and number ofacres ofallcoed land,Any arc mined greater 30 clays
<br /> s
<br /> than one acre must be permitted.The aflpvopriaic bond Must he received (60 days)
<br /> Wfoic the permit can be issued.
<br /> On-site inspection by N,C,Division Forest itesunrccs if permit exceeds 4 1 day
<br /> North Carolina Burning pellnit days
<br /> (N/A)
<br /> On-size ins
<br /> pection by N�C�Division Forts i kcsourov's rectaired"irmore Own
<br /> E]
<br /> Special Ground Clearance Binning Permit 22 1 day
<br /> Ivtacces ca,gvouml sloartn arrivare,arc involved.Inspections-,hould.be
<br /> cotallies in coastal N.C.with organic solls (NA)
<br /> requested at icast wn days before actual hum is planned
<br /> 90-12
<br /> Oil Ref njn2 FariEtics j T4?,A
<br /> N/A)0 days
<br /> HPUnil required,apph=:ion 60 days befibic begin constriiciion.Applicant
<br /> must faire N.C.qualified engineer to;pi-que plans,inspect construction.
<br /> Certify construction is.according,(c,ENR approved plans.May also require
<br /> permit wider mosquito control program.Au4l a 40-1 permit from Corps of 30 days
<br /> Dam Safety permit
<br /> An inspection of sin,is necessar y' to verity I iazard Classification, (60 days)
<br /> A uninimum fee of'S200.00 must accompany dic vppkaiion.An additional
<br /> procv,Nsin¢lee based on a imee0t2gle or Phe total pfQjeel Cost will he required
<br /> upon completion.
<br />
|