Browse
Search
Agenda - 09-01-2015 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 09-01-2015 - Regular Mtg.
>
Agenda - 09-01-2015 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 8:42:45 AM
Creation date
8/31/2015 8:39:29 AM
Metadata
Fields
Template:
BOCC
Date
9/1/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 09-01-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> 1 Chair McKee: Got a motion, and a second. All in favor say, aye. Opposed, no. Motion <br /> 2 passes, unanimously. Thank you. Thank you all. <br /> 3 <br /> 4 VOTE: UNANIMOUS <br /> 5 <br /> 6 Commissioner Dorosin: You know, there was just an episode of The Simpsons that featured <br /> 7 a Waldorf School. Just two weeks ago. Yes, they turned Springfield Elementary into Springfield <br /> 8 Waldorf School. So you should watch that— it's hilarious— serendipitous. <br /> 9 <br /> 10 <br /> 11 2. Zoning Atlas Amendment (Conditional Zoning District) —To review an application <br /> 12 requesting the rezoning of 112 acres of property from Rural Residential (R-1), Upper Eno <br /> 13 Protected Watershed Protection Overlay District to Master Planned Development <br /> 14 Conditional Zoning (MPD-CZ), Upper Eno Protected Watershed Protection Overlay District <br /> 15 in order to allow for the development of Hart's Mill Village within the Cheeks Township. <br /> 16 <br /> 17 Pete Hallenbeck, introduced Michael Harvey, who presented the following PowerPoint <br /> 18 slides: <br /> 19 <br /> 20 MAY 26, 2015 <br /> 21 QUARTERLY PUBLIC HEARING <br /> 22 AGENDA ITEM:C-2 <br /> 23 CONDITIONAL ZONING ATLAS AMENDMENT AND SITE PLAN <br /> 24 HART'S MILL RESIDENTIAL DEVELOPMENT <br /> 25 <br /> 26 PROJECT INFORMATION <br /> 27 PIN: 9835-74-8573 <br /> 28 Size : 112 acres <br /> 29 Zoning: Rural Residential (R-1), Upper Eno Protected Watershed Overlay, Special Flood <br /> 30 Hazard Area (SFHA) Overlay <br /> 31 Future Land Use Map Designation: 20 Year Transition <br /> 32 Growth Management System Designation: Urban <br /> 33 <br /> 34 CONDITIONAL ZONING PROCESS <br /> 35 • Applications are processed in a legislative manner (i.e. does not require sworn testimony <br /> 36 or evidence). <br /> 37 • are based on determination project is consistent with the purpose/intent of the Decisions <br /> 38 Comprehensive Plan. <br /> 39 • Mutually agreed upon conditions can be imposed if they address: <br /> 40 — The compatibility of the proposed development with surrounding property, <br /> 41 — Proposed support facilities (i.e. roadways and access points, parking, screening <br /> 42 and buffer areas, etc.) and/or <br /> 43 — All other matters the County may find appropriate or the petitioner may propose. <br /> 44 <br /> 45 REQUEST <br /> 46 • Rezone 112 acres of the property to: <br /> 47 Master Planned Development— Conditional Zoning (MPD-CZ) <br /> 48 in support of a proposed new residential development and farm. <br /> 49 • Application package includes required site plan. <br /> 50 • Narrative contains synopsis of suggested zoning regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.