Orange County NC Website
10 <br /> 1 • Traffic Management Plan — NCDOT/Summit <br /> 2 • Traffic Impact Analysis — SEPI <br /> 3 • Comments — DEAPR, Solid Waste, Stormwater, Fire, NCDOT, Town of CH, Health <br /> 4 Dept. <br /> 5 <br /> 6 General Standards - 5.3.2(A)(2) <br /> 7 <br /> Standard Support <br /> Maintain Public Health. Physical plan, NCDOT recommendations, comments from <br /> Fire, Solid Waste, OC Health. <br /> Maintain Property Value. Market and impact analysis, existing use as school, physical <br /> plan. <br /> Harmony of existing area and Physical plan, Biological Inventory, tree survey, existing use <br /> comprehensive plan. as school, comments from Parks <br /> 8 <br /> 9 Charlie Viles: And, I think I'm going stop there. And, I'll turn it over to Chad. <br /> 10 <br /> 11 Chair McKee: And before you start, I might note for our Board members, that we have extra <br /> 12 paper copies of the plats, if you find that this is hard to read. <br /> 13 <br /> 14 Chad Abbot: Good evening. My name is Chad Abbott. I have been duly sworn. <br /> 15 Commissioners, I'd like to thank you for your time tonight. And I hope by the end of this you will <br /> 16 see that we have done our best to meet the findings of facts and address the items that are <br /> 17 required for the Special Use Permit Class A in Orange County. I am a licensed engineer in the <br /> 18 State of North Carolina. License number: 036242. I attended NC State, graduated 2005 with a <br /> 19 Bachelors of Science in Civil Engineering and Construction Engineering, with management <br /> 20 concentration. I'm employed at Summit Design and Engineering, here in Hillsborough. We <br /> 21 have been representing the Emerson Waldorf School in this application, to provide planning <br /> 22 assistance and help bring their master plan and goal and vision to the County. <br /> 23 <br /> 24 So, we have been working several months now, probably near a year, trying to get this master <br /> 25 plan such that it was complete, and could appear before you guys. The biggest challenge was <br /> 26 addressing one of the findings of fact, which was the public health safety and welfare, which <br /> 27 was on the DOT (NC Department of Transportation) side of things. Addressing the congestion <br /> 28 and traffic items and concerns that DOT had, as well as MSTA, when we submitted our master <br /> 29 plan submittal. We have satisfied those comments and, per your packets, in the staff reports, <br /> 30 and I know that they do a thorough staff report, and I'd like to thank the staff for their work over <br /> 31 the past year in helping us meet all these standards of evaluations, and explain those to the <br /> 32 details, so we could adequately address those. <br /> 33 <br /> 34 We presented all the environmental findings, the tree inventories. You will see all — and I know <br /> 35 that you have a lot on your agenda tonight, so I don't know that I need to go through each one <br /> 36 of those in detail. If you do need me to, then I can answer questions later. But, in short, I would <br />