Orange County NC Website
000uSign Envelope ID:euuoee14~^enn-4ouE-oo^1-6enrssAnosou <br /> RE: Orange County New Detention Facility <br /> Page 3 August 11 2015 <br /> i, Develop PRB4 and detention policy and procedures standards <br /> j� Conduct poet-ocCupancy evaluation/risk assessment <br /> Estimated Duradiom8 months during construction and 3 months,post-construction <br /> Basic Services to be provided consist of typical detention architectural and landscape <br /> design, civil engineering, security systems deaign, structural engineering, ene»gyane|ytioe. <br /> food and laundry service design, mechanical engineering, electrical engineering, plumbing <br /> engineedng. and fire protection engineering services. Moseley Architects and Orange <br /> County understand that the cost of Basic Services may be adjusted upon amutual <br /> agreernent at the time of the County approval of the schematic design should the scope of <br /> the project vary significantly from the conceptual intent stated in this proposal <br /> Additional Services (if requested) consist of detention operations training and transition <br /> services, geotechnical testing, construction phase required materials testing, building <br /> commiaaioning, and topographical survey services. These eem|oea are listed individually, <br /> and lump sum fees for each ofthese services can be established U desired by the owner, <br /> andanatypicaUy°puae'1hrnugh"aemiceaweoanaddtoourcwmtna(tKdeeioadbythe <br /> Dounty. <br /> Optional Additional services we can provide (and recommend for our detention projects) are <br /> also enumerated below with lump sum fees for each.These consist of full-time on-site <br /> construction administration oemices, telecommunications and data design eervioea, interior <br /> design (FF&E) services, detailed third-party cost estimation services, LEED certification and <br /> verification services. These services can only be Implemented upon written authorization by <br /> the County toproceed. <br /> Note that any hazardous materials testing services and/or remediotionare not included in <br /> our scope ofservices. <br /> Not-to exceed lump sum fees for the Basic Services above are mafmUowm:: <br /> 1. Detailed Design Services: $1,151,250 <br /> 2. Bidding and Negotiation Services: included with Detailed Design Services <br /> 3. Construction Administration and Closeout: $267,000.00 <br /> For the Additional Services listed above, the lump sum fees are aefollows: <br /> m Detention Training and Transition Sem/iuea�$75,0U0.00 <br /> m Geutauhnioaiteating: $TBD if requested <br /> * Construction phase materials testing: $TBD if requested <br /> m Building commissioning: $TBD if requested <br /> w Topographic survey: $TBD if requested <br /> For the Optional Additional Services listed above,the lump sum fees are as follows: <br /> w Full-time on-site construction administration: $241,00@.00 <br /> * Te|ecommumicediona/data design: $38,250.00 <br /> 0 inharior(FF&E) design: $68,500.00 <br /> a Detailed cost estimation services: $28,80108 <br /> 0 LEED certification and verification services: $85,000,00 <br />