Browse
Search
2015-446-E AMS - Terracon Consultants, Inc. for testing of construction materials for Cedar Grove Comm. Center $2,982
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-446-E AMS - Terracon Consultants, Inc. for testing of construction materials for Cedar Grove Comm. Center $2,982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 8:22:35 AM
Creation date
8/18/2015 3:47:28 PM
Metadata
Fields
Template:
BOCC
Date
8/18/2015
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Document Relationships
R 2015-446-E AMS - Terracon Consultants, Inc. for testing of construction materials for Cedar Grove Comm. Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 7A32F47E-0314-4268-B9A1-3143A24CC164 <br /> Irerratcon <br /> COST ESTIMATE <br /> MATERIALS TESTING SERVICES <br /> CEDAR GROVE COMMUNITY CENTER <br /> HILLSBOURGH, NORTH CAROLINA <br /> TERRACCIN PROPOSAL: 137015034611 <br /> ;t A s1r u ,anwr sntusitrad rwwew oftle pins e�unlerstan tMt,oir sres wM�li lirnuted r <br /> i�+�stnng� obseru�at�� pie�'ailninoxgto ullidun� eaupahs�on�,/repaur�� pafk�ng l�f/swd �alk Const�`UCtN�aM�� o�spa�lt <br /> Type of Services/Testing Samples Firs/Mile Mate Units Cost <br /> Task 1 - Soils/ Foundations Observations/Testing <br /> Field Technician (building turndown &footings) 2 5 $45.00 hour $450.00 <br /> Field Technician (site soils/stone proofrolls) 2 5 $45.00 hour $450.00 <br /> Project Manager (reports and review) 3 X $95.00 hour $285.00 <br /> Principal Engineer (reports and review) 1 x $135.00 hour $135,00, <br /> Clerical 1 x $45.00 hour $45,00 <br /> Vehicle Charges 5 100 $0.68 mile $340.00 <br /> Subtotal $1,705.00 <br /> Task 2- Concrete Observations/Testing msµ. <br /> Field Technician (building SOG &footings) 2 4 $45.00 hour $360.00 <br /> Field Technician (pickup cylinders) 2 3 $45.00 hour $270.00 <br /> Concrete cylinder lab testing (5 cyl/set x 2 sets) 10 X $14,00 each $140.00 <br /> Project Manager (reports and review) 2 X $95.00 hour $190.00 <br /> Clerical 1 x $45.00 hour $45.00 <br /> Vehicle Charges 4 100 $0.68 mile $272.00 <br /> Subtotal $1,277.010 <br /> Total Estimated Cast. $2,982.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.