Browse
Search
2015-442-E AMS - Baker Roofing Company for remedial roofing at Hwy 86 North $17,090
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-442-E AMS - Baker Roofing Company for remedial roofing at Hwy 86 North $17,090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 8:13:50 AM
Creation date
8/17/2015 3:31:43 PM
Metadata
Fields
Template:
BOCC
Date
8/17/2015
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Document Relationships
R 2015-442-E AMS - Baker Roofing Company for remedial roofing at Hwy 86 North
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2C304718-BA25-4043-9BDC-F17B3EF664D8 <br /> ()range County Asset NlanagemQnt <br /> Remedial Roofing—AMS North Operations Warehouse and Small Storage, I lillsbOTOLIgh,NC <br /> PR POSAL FORM <br /> Proposal of' Baker Roof inci_Co_ (herein after called Bidder) a_q_qrp organized <br /> and existing Linder the Laws of the State of NQ <br /> Insert corporation,partnership or individual as applicable <br /> To: Orange County Asset (herein after called Owner). <br /> Gentlemen: <br /> The Bidder, in compliance with the bid for Remedial Rooting—AS North Operations Warehouse and Small <br /> Storage, 600 Highway 86 North, Ifillsborough, North Carolina, having examined the Contract Documents <br /> prepared of the work by SthWall Building Diagnostics Consultants, dated May 2015, and addenda,and the <br /> site of the proposed work, and being fain liar with all of the conclitionssurrounding the construction of the <br /> proposed project including the availability of materials, and supplies, agrees to construct the project in <br /> accordance with the Contract Documents, within the time set forth (herein, mid the prices stated below. <br /> T'liese prices are to cover all expenses incurred in performing the work required under time Contract <br /> Documents,of which this proposal is a part, <br /> Bidder further agrees that the amounts and quailtities of"rnaterials be ftarnished mid, work to be done, 'as <br /> stated in the lIIStYUCfi()nS to Bidders, the G cameral Conditions,uiditioni, Supplementary Conditions, and the Technical <br /> Specilluitions and Drawings, arc recognized by It to be a Full and complete indication of file work in its <br /> fibliest and most complete sense, and that it is satisfied with such Notice etc., in determining the prices for <br /> the several classes of'work as specified-, and will not at any tinic dispute or complain that there is any <br /> misunderstanding ill regard to the nature or amount ofniaterials to be furnished and work to be done. <br /> Bidder hereby agrees to commence work under the contract on or before a date to be specified in writing <br /> known as "Notice to Proceed" and to fully complete the project within 30 consecutive calendar days <br /> thereafter as stipulated. Bidder further agrees to pay liquidated damages in the amount of$200 per day,per <br /> building, for each and every day the project remains,incomplete beyond the sebeduled completion date. <br /> Bidder acknowledges receipts of the fbIlowing addenda: <br /> Nurnber 1 Date: 7/6-/15 Number Date- <br /> Number Date: 7/6/15Nurnber Date: <br /> PaL,c I <br />
The URL can be used to link to this page
Your browser does not support the video tag.