Browse
Search
2015-414-E AMS - Lomax Construction, Inc. for DSS expansion $246,600
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-414-E AMS - Lomax Construction, Inc. for DSS expansion $246,600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2015 12:51:42 PM
Creation date
8/10/2015 3:13:23 PM
Metadata
Fields
Template:
BOCC
Date
8/10/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-414-E AMS - Lomax Construction, Inc. for DSS expansion
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:489DFD84-DFCE-4E07-BB35-5F6A708DFA3A <br /> value engineering with the Designer and the Owner) dated 6/30, 2015. which fully <br /> describes the work to be performed, such work(hereinafter called the "Work"). <br /> d. Related documents listed under Section 1 above. <br /> 3. TERM AND SCHEDULING <br /> a. The Contractor agrees to commence work pursuant to the written Notice-to Proceed. <br /> b. The Contractor agrees to complete substantially all Work included by no later than 90 <br /> calendar days after the Notice to Proceed letter is issued and according to a mutually <br /> agreeable schedule between the Owner and Contractor. Assuming that the Notice to <br /> Proceed is issued on August 10, 2015, the date for Substantial Completion will be no later <br /> than November 7, 2015. <br /> c. Time is of the essence with respect to all dates specified in the Contract Documents as <br /> Completion Dates. <br /> d. The Contractor shall perform the Work in the time, manner and form required by the <br /> Contract Documents and as stipulated in a written Notice-to-Proceed to be executed by the <br /> Contractor and Owner. <br /> e. It is expressly understood that the Owner will employ other contractors to perform work as <br /> a part of the Project whose work will be performed simultaneously and sequentially with <br /> the performance of the Work by the Contractor. It shall be necessary for the Contractor to <br /> coordinate its activities with such other contractors, particularly with respect to access to <br /> work areas, storage of materials and other common facilities. <br /> f. Should the Owner determine that the Contractor is behind schedule Owner may require, at <br /> no additional cost to the Owner, the Contractor to expedite and accelerate its efforts, <br /> including providing additional resources and working overtime, as necessary, to perform <br /> the Work in accordance with the approved proj ect schedule. <br /> 4. STANDARD OF CARE <br /> a. The Contractor shall exercise reasonable care and diligence in performing the Work in <br /> accordance with the highest generally accepted standards of this type of Contractor <br /> practice throughout the United States and in accordance with applicable federal, state and <br /> local laws and regulations applicable to the performance of these services. Contractor is <br /> solely responsible for the professional quality, accuracy and timely completion and/or <br /> submission of all work. <br /> b. The Contractor shall not load or permit any part of the Work to be loaded with a weight <br /> that will endanger its safety, intended performance or configuration. <br /> c. Contractor shall be responsible for all errors or omissions caused by its employees, agents, <br /> contractors, or assigns in the performance of the Agreement. Contractor shall correct any <br /> and all errors, omissions, discrepancies, ambiguities, mistakes or conflicts at no additional <br /> cost to the Owner. <br /> Revised 10/14 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.