Browse
Search
2015-414-E AMS - Lomax Construction, Inc. for DSS expansion $246,600
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-414-E AMS - Lomax Construction, Inc. for DSS expansion $246,600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2015 12:51:42 PM
Creation date
8/10/2015 3:13:23 PM
Metadata
Fields
Template:
BOCC
Date
8/10/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-414-E AMS - Lomax Construction, Inc. for DSS expansion
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:489DFD84-DFCE-4E07-BB35-5F6A708DFA3A <br /> 6. Delete all 092216 Metal Framing,092900 Gypsum Board and 095113 Acoustical Panel <br /> Ceilings from the scope of work to be done by owner. Note this also deletes the 500 SF <br /> quantity allowance for ACT listed in the Allowances section. <br /> 7. Delete the diamond grinding and sealing of concrete for rooms listed in the finish <br /> schedule. Owner to chemically remove remaining flooring and flooring mastic and seal <br /> concrete. <br /> 8. Delete all 099123 Interior Painting and 099600 High-Performance Coatings from the <br /> scope of the work to be done by owner. <br /> 9. Delete all plumbing"trim out"of the"Coffee Shop'area to be done at a later date. <br /> Includes rough-in only at this area for plumbing. <br /> 10. Delete all electrical"trim out"of the"Coffee Shop"area to be done at a later date. <br /> Specifically this deletes(1)type A fixture, (1)dimmer switch,(1)type D fixture,all <br /> receptacles and GRC conduits in this area. Includes installing circuits required for future <br /> "Coffee Shop"to junction boxes left above ceilings. <br /> In addition to the items discussed above the following items were also deleted to get under the <br /> budget: <br /> 11. Delete the requirement for a construction sign. <br /> 12. Change all plumbing drain and vent piping from cast iron to PVC except above plenum <br /> rated ceilings where cast iron will remain. <br /> 13. Change plumbing water piping from copper to CPVC except above plenum rated <br /> ceilings where copper will remain. <br /> 14. Delete 101100 Visual Display Boards(Chalkboard and Picture Hanging Rails)at"Coffee <br /> Shop" area. <br /> 15. Deleted 105201 Fire-Protection Specialties from the contract to be supplied and installed <br /> by owner. Note:no fire extinguishers were found on the plans but there was a <br /> specification section so I included a total of(2)fire extinguishers in the bid. <br /> Sincerely, <br /> Travis Langley <br /> VP Pre-Construction <br /> Lomax Construction,Inc. <br /> I <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.