Browse
Search
2015-373-E Planning - Hazen & Sawyer to inspect Lake Orange Dam $5,200
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-373-E Planning - Hazen & Sawyer to inspect Lake Orange Dam $5,200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 11:15:38 AM
Creation date
7/30/2015 8:25:27 AM
Metadata
Fields
Template:
BOCC
Date
7/29/2015
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Document Relationships
R 2015-373-E Planning - Hazen & Sawyer to inspect Lake Orange dam
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AF213AC7-5247-4BE1-89BB-8589F8088302 <br /> MM MD SAWM Hazen and Sawyer,P.C. <br /> 4011 WestChase Blvd. <br /> Environmental Engineers & Scientists Raleigh,NC 27607 <br /> 919-833-7152 <br /> Fax:919-833-1828 <br /> July 14, 2015 <br /> Mr. R. Kevin Lindley, P.E. <br /> Staff Engineer <br /> Planning & Inspections Department <br /> Orange County <br /> 200 S. Cameron Street <br /> PO Box 8181 <br /> Hillsborough, NC 27278 <br /> Via email: klindley @orangecountync.gov <br /> Re: 2015 Inspection of Lake Orange Dam <br /> Dear Mr. Lindley: <br /> At your request, Hazen and Sawyer is pleased to submit this proposal to Orange County <br /> for professional engineering services to complete a reconnaissance-level inspection of <br /> Lake Orange Dam. The level of effort that we propose is consistent with our 2009 <br /> inspection. The purpose of the 2015 inspection is to make a general assessment of the <br /> condition of the dam and appurtenances based on a visual inspection and to identify any <br /> potential areas of concern that might warrant closer examination and/or remedial <br /> attention. <br /> The scope of service that we propose for this assignment is as follows- <br /> 1. The undersigned or other qualified engineer will complete what is expected to <br /> be a one (1) day reconnaissance-level inspection of the dam and <br /> appurtenances. <br /> 2. Physically inspect the dam embankment and abutment contact areas to identify <br /> any indicators of excess seepage or unusual embankment performance. As in <br /> the 2009 inspection, we would prefer to make this inspection soon after the <br /> embankment has been mowed to improve our opportunity for detecting any <br /> embankment deficiencies. Our inspection will include a visual assessment of <br /> the "bowls" that your contract mower has observed on the downstream dam <br /> slope. Although, we expect that these will be ready detectible in the field, to <br /> make sure that we do not miss any of these areas, we recommend that the <br /> mower flag the individual "bowls" and/or that you or another knowledgeable <br /> person from your office attend the inspection. <br /> 3. Physically inspect the intake structure and related equipment to identify any <br /> unusual conditions or areas of concern. <br />
The URL can be used to link to this page
Your browser does not support the video tag.