Browse
Search
Agenda - 08-21-1979
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1970's
>
1979
>
Agenda - 08-21-1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2015 10:37:47 AM
Creation date
7/14/2015 10:36:56 AM
Metadata
Fields
Template:
BOCC
Date
8/21/1979
Meeting Type
Work Session
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 Fob 79 Controls at 01 , 2, a, and r have ,ailed. Intevior too soupy <br /> to inspect.. <br /> 7 Mar blo action on perimeter controls, Interior Still too wet <br /> to inspect, <br /> lT; Ma;- No 4.ork done on any of the requested centrols. <br /> 21 Mar Mellott laying base course on roads in section 2. No change on <br /> sediment: controls, <br /> Geof <br /> 27 Mar Met at site with Van Evans and Red Neville. tied is to handle <br /> work on sediment controls. Gave them list and map of rark <br /> needed on all three sections. (sediment controls only) <br /> Vent over list, and visited each control point with them. <br /> 30 1'a r. No change in sedipent control status. <br /> 2 Apr ldo change. <br /> 5 Apr I-to change. Called Real Neville. He will start on controls OF; <br /> 9th and be finished on 121:h,weaLher pernAttincd. <br /> 1:3 Apr (Refer to March 26 Maps) <br /> Inspection <br /> Point 1 - No action as yet <br /> Point 2 Silt fence repaired •- ol; <br /> Point 3 Still no control <br /> Point 4 Pit has been clipped out - ok <br /> Point G - Gravel is not down an road <br /> Point 5a- Pit dipped out and some new boulders in, but repairs <br /> are insufficient <br /> Point y - Pit dipped out and earthen 'wings' added to filter <br /> berm - ok <br /> Point 7 •- No action as ,yet <br /> Point. B •- Stone filter berm installed - ok <br /> Point 9 - No action as yet <br /> Point lil- New ditch installed and pit clipped Out. Wed to <br /> stabilize sediment in Moods at this point <br /> Point ll- No action as yet <br /> Point 12- No action as yet <br /> Point 13- No action as yet <br />
The URL can be used to link to this page
Your browser does not support the video tag.