Orange County NC Website
26 Fob 79 Controls at 01 , 2, a, and r have ,ailed. Intevior too soupy <br /> to inspect.. <br /> 7 Mar blo action on perimeter controls, Interior Still too wet <br /> to inspect, <br /> lT; Ma;- No 4.ork done on any of the requested centrols. <br /> 21 Mar Mellott laying base course on roads in section 2. No change on <br /> sediment: controls, <br /> Geof <br /> 27 Mar Met at site with Van Evans and Red Neville. tied is to handle <br /> work on sediment controls. Gave them list and map of rark <br /> needed on all three sections. (sediment controls only) <br /> Vent over list, and visited each control point with them. <br /> 30 1'a r. No change in sedipent control status. <br /> 2 Apr ldo change. <br /> 5 Apr I-to change. Called Real Neville. He will start on controls OF; <br /> 9th and be finished on 121:h,weaLher pernAttincd. <br /> 1:3 Apr (Refer to March 26 Maps) <br /> Inspection <br /> Point 1 - No action as yet <br /> Point 2 Silt fence repaired •- ol; <br /> Point 3 Still no control <br /> Point 4 Pit has been clipped out - ok <br /> Point G - Gravel is not down an road <br /> Point 5a- Pit dipped out and some new boulders in, but repairs <br /> are insufficient <br /> Point y - Pit dipped out and earthen 'wings' added to filter <br /> berm - ok <br /> Point 7 •- No action as ,yet <br /> Point. B •- Stone filter berm installed - ok <br /> Point 9 - No action as yet <br /> Point lil- New ditch installed and pit clipped Out. Wed to <br /> stabilize sediment in Moods at this point <br /> Point ll- No action as yet <br /> Point 12- No action as yet <br /> Point 13- No action as yet <br />