Browse
Search
Agenda - 08-06-1979
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1970's
>
1979
>
Agenda - 08-06-1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2015 10:34:13 AM
Creation date
7/14/2015 10:29:55 AM
Metadata
Fields
Template:
BOCC
Date
8/6/1979
Meeting Type
Work Session
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in iddjulun. UK OEW Is madu subJect to the folio M canditlons; <br /> i. State grant payments W3 be limited to 50Z of the non-YUnral s%re of the eHgMl�; <br /> project cost or the amount of t grant offer, whichuvar is less. <br /> 2. This offei in contingent upon s"Kission and ap,aval of an exasion and sedimantat! <br /> control plan by the Land Quality Suction of the respective field offices of the <br /> Deparmant of Nutural Resnurces and Camnunity Dnvelopmcnt <br /> 3. No raimbursemenc for cost of sewers to serve the industrial Park 032 be made until an,-, <br /> unless n permit for the construction of those sawels is issued by the Division of <br /> ---------------------------------------- <br /> ibis. Offer must be accepted, if at all, on or befowe AUG 22 IN <br /> FOR THE SLATE OF NORIH CA10111`�A, <br /> 71 <br /> D <br /> - ate: <br /> Authorized State unprazent <br /> Name and Title: Voward N, Lee, Socratary <br /> North Carolina Daparbaent of Natu:al Resources L Community Develo. <br /> SECTION 11 - ASSURANCES <br /> The Applicant hereby gives assurance to the Environmuntnl Management Coz=lsvion that: <br /> A. the final plans and specl-f1cations have or will be approved by the Environmental <br /> Management Commission and the applicant so notKind, prior to the project bein-Z <br /> advertised or plowed on the market for bids., <br /> V 1ho consuru,vion contract(::) requiren the contractor to furnish parformancL and <br /> payment boa d5. each of hhj�ch is In on anount of not less than fifty parcontum (W <br /> of the contract price, and to maintain during the life of the contract(s) adaqua(: <br /> fire, and extended c—erage, w0fl''me"'s compznsatlon, public liability and proparr. <br /> danage Insurance. <br /> C, Joe construction of the project, including the letting of contracts in connectio-i <br /> chetavich, conforTs to the applicabin requirensnts of Stater and local laws and <br /> Qtdlnraces.. <br /> W Any change or chopoes in the approved plans and specifications or contract(s) <br /> wij_l make any major alteration in the wo& required by the plcus and <br /> or which incrersws the cost of the project above the latest esti, <br /> �!ppro,jed by the Environmental <br /> ,fanagement Commission 'was or will be subin-itted to <br /> Environmental Management Commission for prior approval. <br /> Y The construction contract(s) provides that any duly authorized representative of <br /> State will have access to the work whenevel It is In preparation or proBTass and <br /> that the contractor will Provide Proper fzcilitics for such access and inspection <br /> F. .the applicant 0131 provide and maintain competent and adequate engineering sukrv' <br /> 0100 and inspection of the ProNct to insure that too construction conforms wit! <br /> the approved Plans and Specifications., <br />
The URL can be used to link to this page
Your browser does not support the video tag.