Orange County NC Website
I, <br /> I. <br /> sewage to the land being used for the septic tanks. <br /> Mr. DobelstFin expressed concern, over the Water system_ He was tole <br /> that the pr9blem was with the design, and that this had been worIzed <br /> out. Anoth r water sample would be taken before approval could be <br /> received_ <br /> The Board was told be Mr. Kirk that the was not aware of any future <br /> plans for- the development, and that the owners were doing their otan <br /> developing_ <br /> Mr. Efland as concerned that the Connmi.ssioners might want informati <br /> about the p `oposals effect on the watershed as was requested for the <br /> Bowden. subdivision,,. MYr. . Kirk told the Board that since there was sc <br /> buffer stri (co-op land) that these would not, except for the road <br /> constructio , be much effect on New Hope Creek. <br /> Mr. Caldwell moved to approve the preliminary plan. Mr. Efland <br /> seconded. r4he motion was unanimously approved. <br />