Orange County NC Website
12X <br /> PROPOSED nODIF CATIONS AND AIMENNDHENTS TO THE ORA.N'GE (IMI'-l"TY $0.1L FIRMSMN AND <br /> COYEROL ORDIZ42LiCS <br /> oSeetiaa 3 add: <br /> . i <br /> ee. EnerAv Dissipatoi - means a structure or a shaped channel section <br /> __�ri th�1 r echanical armoring placed at the outlet Of Pipes or conduits <br /> to receive and break dorm the energy from high velocity floe. <br /> ff. Stor! Drainage Facilities_ - means the system of inlets, conduits, <br /> chati.jels, ditches, and appurtanances which serve to collect-and <br /> convey stormwater through and from a given� drainage area. <br /> gg. Ten, Rear Storm - means the surface runoff resulting from a rainfall <br /> of I, intensity expected to be equalled or exceeded, on the average <br /> onc!I in 10 years, and of a duration which will produce the <br /> maximum peak rate of runoff, for the watershed of interest under <br /> 2 Age antecedent wetness conditions. <br /> h1h =eans the average velocity of floe through the cross <br /> section of he main channel at the peak flow of the Storm of <br /> iate est. The cross section of the main channel shall be that <br /> area defined by the geometry of the channel plus the area of the <br /> flow below the flood height defined by vertical lines at the main <br /> chart el banks. Overload flows are not to be included for the <br /> puip dsa of computing velocity of floe. <br /> Section 6 delete existing section and substitute: <br /> Recuir- <br /> a Plan I - --ment an erosion and sedimenvcontrol,on control plat shall <br /> l <br /> -7---7- <br /> be plepared and =fled with the Erosion Control Division =" ; prior to <br /> the Tom aenW-ment of any land disturbing adtivity whenever tha <br /> propped activity will result in the uncovering of more than <br /> 40,0@0 contiguous square feet. <br /> b. ion - the person responsible for the land distirbing <br /> actly y must obtain an Erosion Control Plan Exemption Form fro- <br /> the Erosion Control Division, prior to the commencement of any <br /> land ipturbing aqUvAy whenever the proposed activity will result <br /> in t I uncovering of more than 20,000 contiguous square feet. <br /> c. Protection of fropeTty - persons engaged in land disturbing acti- <br /> vitl6s shall take all reasonable measures to protect all public <br /> and �rivaw property from damage by such activities. This require- <br /> sent shall apply to any area to be disturbed, regardless of the <br /> size of the area to be uncovered. <br /> Section 7f. elete existing sub-section and insert: <br /> f. Mana 6 Storm Vater Runoff - then the increase in the peak rates <br /> and yelocity of storm water runoff resulting from a 'land-disturbing <br /> acti it Y is sufficient to cause accelerated erosion of the receiv- <br /> ing teicourse, plans are to include measures to control the <br /> velocit • and rate of release at the point of discharge so as to <br /> niniu ize accelerated erosion of the site and increased sedimentation <br /> of die stream. <br /> Section 9 <br /> J1. - W omit the word certain <br /> dele e sit --sections a. & b. and substitute: <br />