Orange County NC Website
ATTACHMENT I <br /> Northside Chan e Orders <br /> Two change orders are necessary at the Northsi.de Mental <br /> Health project. <br /> A. The Board hould forscertainuplasteringe atawil.l, not accept <br /> be done. <br /> credit of $320 <br /> B. The Board should authorize a change order f ri 2protectiox <br /> to cover' installation of some 40 dampers <br /> devices designed to place barriers within the duct work of the <br /> heating/air conditioning system at points where this duct work <br /> opens into the main building structure. <br /> ent <br /> The Division of Facility Services of the State Depaartmtructur� <br /> of Administration has design approval authority over <br /> constructed using State funds. Some two years ago that agency <br /> approved the plans and sPeicstn � en �veslHealth <br /> At a prefinal inspection in August, of --+-hat agenc <br /> decided ceilings in the structuretheyewou fireproof <br /> of their previous plan appr oval , <br /> for final occupancy Until fire dampers were <br /> that carry air throughout the building, one damper <br /> Negotiations with that <br /> outlet into the body of the building. <br /> agency have proven fruitless. tie must install ravalefordhe ebuildix <br /> our expense, prior' to their giving final. app <br /> occupancy. <br /> In this years Public Works budget$ the Board provided funds <br /> for certain outside improvements at this sate (mainly parking) - <br /> Money to cover this change order can be taken from that source the Board so desires . <br />