Browse
Search
Agenda - 05-31-1978
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1970's
>
1978
>
Agenda - 05-31-1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2015 3:11:23 PM
Creation date
7/10/2015 3:10:20 PM
Metadata
Fields
Template:
BOCC
Date
5/31/1978
Meeting Type
Work Session
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� i <br /> �2- <br /> �np t of Mdntenance sen-ices. <br /> Staffing for mint, .c services has not kept pace with the expansion <br /> of physical facilities. At the same tim, continuing requests are being <br /> made for th� provision of expanded services. In an effort to protect the <br /> present fac lities, a systematic preventative maimbe-n noe program is needed. <br /> The follrxring 5 1/2 positions are proposed to mwztaixx present services; <br /> one plumber, one beating-air corAituxAng Vic, two painters, one and <br /> ca-be-half grounds persons. Two and one-half positions are included to ine- <br /> prove sexv:k;es: One grounds person and me carpenter. Cne-bal.f clerical <br /> position i,s included to maintain proper records and to manage, the preven- <br /> tative main t program. <br /> The anticipated cost for this inprov t is $79,484.16. <br /> 2. Expansion of PaTedia.l Proqram. <br /> This �rovement goal has three major cxarg meats. The first of the <br /> is to provide raTedial support for students in serious behavior and tic <br /> difficult-Y 4t the ;junior high level. The .second is to establish swirer <br /> school programs for 300 elementary pupils who are not achieY IjV9 acadei cally <br /> as they shoLd and to provide summer school programs for high school pupils <br /> who need adLtional help to be suo essful in the high sdml competency tests. <br /> The third aped is to provide br n additional reading teachers at the <br /> Secondary s Y al .l 1. Federal funds, lxywever, will support this cost. <br /> The axn i cipated. cost for this improvement is $64,550-00. <br /> 3. Services for children with special mss. Aa 2� I CA-6""t- <br /> Three <br /> w program areas are proposed. They are (axle vic es for <br /> emL-i.onally handicapped pupils, (b) services for children who are severely <br /> hearing irmpeired, and (c) services for Gifted and Talented Children at the <br /> Jtnior High level.. In addition, thirty per-cent of a psychologist position <br /> will be addke� using federal f 4s. <br /> The an `cipated cost for this i.njrw'emsnt is $59,436.00. <br /> sla nt of the Aide rat. r �� <br /> The sch--ol 4 Ccmtanu l�v . <br /> system has been ncving for several years toward the provision <br /> of 1Mre aids to assist teachers. <br /> The anticipated cost for this jinprovenent is $34,719.63. <br /> 5. 'leacher �S`appwenent. <br /> The budget proposal includes a 5% increase in the supplement schedule. <br /> This would eflect the same increase prca3ected for bay salaries. <br /> The an ipated cost for this improvement is $15,000.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.