Orange County NC Website
-3- <br /> ESTES HILLS ELEMENTARY SCHOOL <br /> Place permanent fence at ottom of bank $ 2,000.00 $ 62,200.00 <br /> GLEI�WOOD ELE��IENTRRY SCHOOL <br /> Storage area ext to boiler room 11800.00 64,000.00 <br /> Glenwood Play Field 5,000.00 69;000.00 <br /> GUY B. PHILLIPS JUNIOR HIGH SCHOOL <br /> Renavat on of lie is Center 15,000.00 84,000.00 <br /> Modification of intercom system to have <br /> call-back opacity 2,400.00 86,400.00 <br /> Total Individual Schools $ 86,400.00 <br /> Su_mmary: Cap, tal Outlay N <br /> Construction Bond Program) $163,573.00 - <br /> System-wide N eds :,.. -C 170,027.00 <br /> Individual Building Modifications 86,400.00 <br /> Contingency 30,000.00 <br /> Total $450,000.00 <br />