Orange County NC Website
1 -2- <br /> Amount Cumulative Total <br /> General Al1oc tions &Z�AX_�' & <br /> Computer pure ase (Payment postponed to <br /> next budget year) <br /> Per-Pupil All cations for Furniture <br /> Replacement $ 15,000.00 $ 40,700.00 <br /> Per-Pupil Allocations for Instructional <br /> Equipment 8,120. 0 48,820.00 <br /> Uniforms for Viand 5,000.00 53,820.00 <br /> Film Equipment 2,000.00 55,820.00 <br /> Cafeteria Equ(ipzment 5,000.00 60,820.00 <br /> General Furniture Allocation 10,000.00 70,820.00 <br /> Printing Equippment-Lincoln Center 7,000.00 77,820.;70 <br /> Cafeteria Furniture Replacement (CHITS) 12,000.00 89,820.00 <br /> Vocal ilusic Equipment 880.00 90;700.00 <br /> Instrumental Music Equipment 14,000.00 1045700.00 <br /> Replacement o I ' Instructional Typewriters <br /> and Sewing 4achines 5,440.00 110,140.00 <br /> Art Equipment� (All Schools) 5,000.OU 115,140.00 <br /> Athletic Equi anent (3rd Year) 25 ,587.00 140,727.00 <br /> Physical Eduction Equipment (All <br /> Schools) 4,500.00 145,227.00 <br /> Custodial Equipment 4.,000.00 149,227.00 <br /> Cafeteria Equipment 4,000.00 153,227.00 <br /> Maintenance Equipment 12,800.00 166,027.00 <br /> Maintenance C rmmunication System 4,000.00 170,027.00 <br /> Total r- <br /> 1 70,, <br /> Contingency (Total ) $ 30,000.00 $ 30,000.00 <br /> RE;LOVATI ONS y ALTERAJIONS, CONSTRUCTI OR <br /> AND RECONSTRUCTI0'N BY SCHOOLS <br /> CARR6C'ftO ELD 0TARY SCHOOL. <br /> � <br /> Public AddSysterm to mobile unit $ 400.00 $ 400.00 <br /> CHAPEL HILL S NIOR HIGH SCHOOL <br /> Construction f e-le-Guidance Offices <br /> (former Art Rooms) 24,000.00 24,400.00 <br /> Modification f Science Rooms to create <br /> one additional Science Lab 21 ,000.00 45,400.00 <br /> Gate across roadway between student <br /> parking lotIP at the top of the hill <br /> leading to athletic fields 800.00 46,200.00 <br /> Paving of Bus Parking Lot 9;000.00 55,200.00 <br /> Two-way commu ication system <br /> (main to A ldg.) 5,0010.00 60,200.00 <br />