Browse
Search
Agenda - 05-01-1978
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1970's
>
1978
>
Agenda - 05-01-1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2015 4:49:34 PM
Creation date
7/9/2015 4:48:37 PM
Metadata
Fields
Template:
BOCC
Date
5/1/1978
Meeting Type
Work Session
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Problems and Requests <br /> Dental Clinic <br /> (1) 'Construct, relocate, or remove walls as indicated on the <br /> attached diagram. <br /> (2) Install 220 VAC, W A power line from main panel office an <br /> (Multipurpose Center office to Dental Clinic for compressors. <br /> (3) Reroute plumbing to supply existing Dental Units as indicated <br /> on attached drawings. <br /> (I�) Install two additional sinks in present waiting room area. <br /> (5) Install sink in darkroom area (opposite side of hall). <br /> (6) install seven, 110 VAC, 20 A standard wall recepticals as indicated <br /> do drawing: <br /> 6 in present waiting room area(4 in existing walls, 2 in <br /> new wall to be constructed) <br /> 1 in area where compressor is presently located. <br /> (7) 1 eplace tile floor which is presently loose and broken. <br /> (8) Re-paint non paneled walls. <br /> Medical Clhic <br /> Most I Olt the Medical Clinic's problems arise from poor patient flow and <br /> inadequate soundproofing. The proposed changes in the physical facility <br /> would rectiky this situation. They are: <br /> (1) Construct, relocate, or remove wall's as indicated on the attached <br /> axing. <br /> (2) <br /> -1 nstall a sink in the examination room area for use by student <br /> doctors to reduce congestion in the laboratory. <br /> (3) I stall a drop ceiling with provisions for venti.11ation(note <br /> position of radiators) and lighting. <br /> (4) Install inexpensive carpeting throughout the clinic, except <br /> td e laboratory. <br /> (5) Fill interior walls with foam or vermiculite insulation. <br /> (6) Re paint non paneled walls. <br />
The URL can be used to link to this page
Your browser does not support the video tag.