Orange County NC Website
M k n <br /> adequately described the proposed development of the tract and <br /> the measures planned to comply with the requirements of this <br /> ordinance. The plan shall comply with all applicable State an <br /> local xequlatiOns for erosion and sediment control . Plan con- <br /> tent m y vary to meet the needs of specific site requirements. <br /> Detail d guidelines for plan prepar,ati-on. may be obtained fz:om <br /> ,the So' l Conservation Service Guide for erosion control on con <br /> str"Uction sites or frown. the Erosion Control. officer on. request <br /> e. Appli,c tion for amendment of an erosion control plan in writte <br /> and/or graphic form may be made at any time under the same. cor <br /> di.tions as the original. application . lyntil such tine as said <br /> amendm nt is approved by the Erosion Control officer, the lane <br /> disturbing activities shall not proceed except in accordance <br /> with t e erosion control plan as originally approved. <br /> Section 19 AAP� ears <br /> a. The di approval or- modification of any proposed erosion contr, <br /> plan by the Erosion Control: officer shall entitle the person <br /> submitting the plan to a public hearing if such person submit <br /> writte demand fox a hearing within 15 days after receipt of <br /> written notice of disapproval or modification. <br /> b. (1) Hearings held pursuant to this section shal be conducted fi <br /> the Orange County Planning Board within days - after <br /> of written demand for such hearing made by the person submi.tt <br /> the plan when such plan i.s .for land disturbing activities occ <br /> outs! e the ,corpora.te limits of the townsc}f. Chapel Hill, . Carz <br /> Hillsborough and Mebane. <br /> (2) x e Orange County Planning Board shall make recomnendati_c <br /> to tbE Board of Gomr.lissi,oners of Orange County.. within 30 days <br /> after the date of the hearing on such ..erosion control. plan- <br /> (3) TI e Board of Commissioners of Orange County will rendex- <br /> final. decision on any erosion control plan upon which a hea3 <br /> is requested within 30 days of receipt of the recommendation: <br /> from he agency conducting the hearings. <br /> c. (1) H a wrings held pursuant to this section shall be conducte,i <br /> a designated agency of the appropriate town board within 30 + <br /> after receipt of written demand for such hearing made byy the <br /> submitting the plaza. when such plan is for land disturbing <br /> acti.v�ties occurring within the corporate limits of the town <br /> Chape Hill, Carr'boro, Hillsborough or Mebane. <br /> (2) T e said designated agency shall make recommendations to <br /> appro riate town board within 30 days after the date of the <br /> heari g on such erosion control. plan. <br /> (3) T e said appropriate town board will render its final de <br /> on an', erosion control plan upon which a .hearing i..s requestre <br /> in 30 days of receipt of the recommendations from the said d <br /> gnat d agency conducting the hearings. <br />