Orange County NC Website
oz_/-� / <br /> T4Z E. NARC NRET LANE 19 EAS;'CA7E SHOPPING CENTZR <br /> H:!L:7D��L1GF4. N.� C•�27Z70 CH.aPM HILL. N C 27514 <br /> T1 i40Nc: '7322 5t8! E-Y.. ^I5 PHOM— 942 <br /> (FROM CHAPEL HILL 487-72]1) <br /> ;KE L 10 <br /> TO: Orange County Board of Health <br /> FROM: Jerry Robi I son <br /> DATE: February I6, 1978 <br /> REGARDING: Cost Analysis for the Consideration of Assessing Fees for <br /> Environmental Health Services. <br /> We may by States- statute, with recommendation by the Health Director, by adoptioi <br /> by the Board of Health and by a facilitating action of the County Commissioners asses: <br /> fees for selected environmental services not to exceed our cost. The following analy: <br /> results in fee levels that would recapture our costs as best as I can project such co! <br /> I furthermore recommend, equal application of these set fees to all persons using such <br /> services. In con�ert with the State Statutes these fees are recommended to be assess= <br /> for services rendered and not for licensure. All permits and licenses resulting from <br /> the sanitation wotlk will be issued at no cost. The detailed cost analysis which re- <br /> sulted in these fee levels has been placed on file in the Hi ll.sborough Office of the <br /> Health Department for public inspection. Those services singled out for fee assess-.- <br /> meat are those co is presently b=n by the general taxpayer from which private profit <br /> diarectl.y or indirectly is facilitated. <br /> Fees for Land Development Services <br /> Preliminary Lot E aluation <br /> Average man day total cost equals $77.91 <br /> Average travel. ti �e and eiraluation of lst acre takes 1 hour: cost $9.75 <br /> Avera©e analysis ime- for :remaining acres at approximately 3 acres per hour on sane <br /> trip: cost $3.25 per each acre after 1st acre. <br /> Therefore: <br /> 1st acre cos per job order per day 9.75 <br /> Analysis of" d acre on per job order on same day 3.25/acre <br /> Soil AnAzsis On each Lot <br /> Average man day total cost equals $77.91 <br /> Average number of actual field work , <br /> Lest soil analysis possible per day equals 4, however, <br /> 1/4 of day oh average is required in' office for every 3 lots done. <br /> Therefore, t e cost per lot is figured at 3 lots per day into the <br /> man-day aver ge cast- which will cover office time .. .... ... . . .. . .... $25.97 <br /> Inspection for lm xovenent Permits <br /> Average number of actual field work inspections . . <br /> possible per day equals 5. An additional 1/5 of <br /> day is neede for every 4 lots done for office tire. <br /> Therefore , t e cost per lot is figured at the total <br /> average man_�av cost divided by 4 . .. . . .... .. .. _.. . ... _.. .. .. . <br />