Orange County NC Website
- 00i\ID's F4 R- <br /> THE $30010001000 IN ADDIT IOIN <br /> R E_0 0Jai i 1 =1 1D iE__ <br /> HIGHWAY Five thousand of . ^ OOO �ridges <br /> need <br /> major improvement or replacement. <br /> PUTTING SOND Highway bonds have been issued many <br /> North Carolina's 75,000 miles of state- times before in North Carolina and have <br /> maintained roads have some pressing IVIOEY TO WORK proven to be agood investment.The Statct <br /> NI <br /> needs.The sale of highway bonds has been has achieved a AAA credit rating fCr its <br /> a traditional and practical way to obtain}m- Approval of the$300,000,000 bond issL€e bonds and can borrow money at the ends,lowest <br /> mediate funds for new construction,safety would allow an additional$60,000,000 a passible interest rates. By selling <br /> improvements and relocation of roads, ear,for_the next five years,to be spent on money can be obtained to met highway <br /> bridges and other needed highwayfacili- y <br /> North Carolinas highway Prolec- needs now, <br /> increased solo thereby <br /> tion costs i€ater�€R�:corcis <br /> ties. led revenue from State and F <br /> Revenue from bond sales will enable the to reve , over the next five years, provide sliow that since 1067,highway construction <br /> State to continue in its effort to connect the es Would,billion in funds to address these costs have doubled. <br /> PORTS to the PIEDMONT and MOUN- > <br /> highway needs.That figure, if bond <br /> TA1t�lS, and to complete a unified transpor- roved,would increase to X1.3 ��,y. t, <br /> issue is app O i I ' z <br /> tation corridor system.The ultimate goal is billion to meet needs over the same five -%Ll = <br /> to provide adequate roads for the move- year period. TAXES ECES-S y'Ily <br /> ment of people and goods across our State Y [� _r <br /> from north to south and from east to west. There is also a need to be sure money is <br /> According to Department of Transports- available to match federal-funds as they be- <br /> tion studies.there are 16,400 miles of North come available to the State.The it <br /> Carolina roadway in need of improvements $300,000,000 will not meet all these needs The Bond Prograrn will not recta€ire any <br /> ranging from providing missing lin4ts and buy the n making will <br /> mosot de a good begin- <br /> lghway addi#ions!State gasoline tax?The�c Governor <br /> widening to major resurfacing.A general n r3 and the Department of Transportation feel <br /> upgrading of the system is necessary to €Over the next live year s,$175,000,000 that more taxes aren't the an-e-Wer to nigh- <br /> maintain safe roadways for the motoring would be used for primary roads, way revenue problems at this time.One <br /> public. 000,000 far secondary roads, and cent of the 9-114 cents in State tax no��, <br /> X75, paid on each gallon of gas is presently allo- <br /> Arecent highway needs summary con- $50,000,000 for the urban toad system, <br /> ducted by the Department placed the cost Ten percent of the total bond issue worild sated for payment ei debt.This was estab- <br /> of meeting these needs at$7 billion. lisi�ecf with the voter-afaurcvecl 1�J66 h€chi}- <br /> be allocated for bridge repair and replace way construction bona act.This one cent <br /> ment identified on each of these three will continue to pay Off the 1965 bonds.and <br /> MILES OF systems. would also allow financing of the new <br /> ROAD TOTAL 1MpROVEIVIENT Because highway construclio€ casts are $300,000,000 issue. <br /> DEDED increasing and anticipated gas tax reve- <br /> SYSTEM- MILES ytrustfunds, <br /> nues,which g � a <br /> Primary 12,000 7, 100 have leveled off, bonds Would I rovicie tl}e <br /> Secondary 69,000 9,000 funds to continue needed read improve- <br /> Urban 4.000 300 ments. <br />