Browse
Search
Agenda - 10-03-1977
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1970's
>
1977
>
Agenda - 10-03-1977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2015 11:19:00 AM
Creation date
7/7/2015 11:17:03 AM
Metadata
Fields
Template:
BOCC
Date
10/3/1977
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes - 19771003
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1970's\1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} AGENDA ATTACHMENT 111 '2 <br /> September- 26, 197_ <br /> Mr S. M. Gatti.s <br /> provide efficient insulation for winter heating but. also are significantly <br /> more effective than the existing steel sash against heat gain in the <br /> summer, thereby providing; an added reduction to the cooling load over that <br /> of the "Cool. Shade" screens alone, <br /> Based on calculations by our engineering consultants Y am informed that <br /> the replacement of the existing windows with the proposed insulating win- <br /> dows together with the "Cool Shade" screens already in the contract will <br /> give an expected total reduction in annual average energy demand of some <br /> 15„18 With only the present sash re-glazed and the "cool Shade!' screens <br /> as provided under the present contract, fuel and energy savings could be <br /> expected to be an the order of 1/3 the above figure or a 5-6% saving. <br /> The Contractor has given me verbal confirmation which he expects to back up <br /> with a written confirmation immediately, that his original. bid proposal. <br /> under Alternate C-3 offered July 12, 1977, would still be valid if accepted <br /> at this time or within a reasonably short period (say the next 2 or 3 weeks <br /> or so). lie is also urging prompt consideration so these windows can be <br /> placed on order and delivery can be made without holding up the entire job. <br /> The total cost for this substitution is as follows: <br /> Original. bid Alternate C-3 per bid tabulation, 7/12/77 $12,800.00 <br /> 1,216.00 <br /> Architect' s Fee C 9.5% <br /> $14 016_00 <br /> ' Fatal, Cost <br /> Ve truly .yours, <br /> James .11. Webb <br /> JK4:h <br />
The URL can be used to link to this page
Your browser does not support the video tag.