Browse
Search
Agenda - 10-03-1977
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1970's
>
1977
>
Agenda - 10-03-1977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2015 11:19:00 AM
Creation date
7/7/2015 11:17:03 AM
Metadata
Fields
Template:
BOCC
Date
10/3/1977
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes - 19771003
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1970's\1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OWNER Eq <br /> c R D E€r, CONTRACTOR ❑ _-------� - <br /> 4 .AlA UOCUA'fENT G701 01HER <br /> PROJECT: No. NC-ME-3b CIIA(JGE ORDER NL)�ViEsER: One (1) <br /> (name, addrt:ss) Center for Orange-Person-Chatham <br /> Mental Health Program, Chapel Hill, N. C. <br /> TO (Contractor) <br /> f—Triad Inc. ARCHITECT'S PROJECT' NO; <br /> P.O. Box 1,905 <br /> Durham, N. C. 27702 CONTRACT FOR: General Construction <br /> �_. �j CONTRACT DATE.Ist day of September, 1 <br /> You are directed to rna .., the follo%ving changes in this Contract: <br /> Include Alternate�G-3 as Oriainally Bid, Jul 12 7 <br /> July 19 7 and for the sum of $12,800.00 <br /> As shown in Drawings, sheet No. Alt G-3-1, dated 4/15/77, entitled <br /> Alter to G=3, Re lacement of Sash - Clinic and specified under <br /> Contract Specifications, Part 11, Div. 0190.8 and 0850.10, 11, 12, 13, <br /> 14 and 15, entitled "Thermal Barrier Aluminum Re lacement Sash" <br /> The oriQi:tal Contract Sum was $ 203,1QO.Q0 � <br /> Net change by previous Ch Change Carders . . . . . . <br /> None <br /> 'The Contract sure prior to t•ia Change Order was . . , . . . , _ . . . _ $ Zt)3,100,QO <br /> The Contract Siren will be ,ncreaseci (decreased) (unchanged) by this Change Order. . . $ 12,800.00 <br /> The new Contract Sum ind ding this Change order will be . . . . . <br /> The Contract Time will be (increased) (decreased) (unchanged) by $ 215,90U.QQ <br /> The Date of Completion as f the date of this Change order therefore is 216 consecutive calendar days ) ©ays <br /> a;tear. Mon. September 19, 1977 or Mon. April 17, 1978 <br /> James M. Webb, AIA, AIP Triad Inc. <br /> ARCHITECT —� -----~ ' Orange County Board of Cox <br /> 201 E, Rosetaa�}�-► St r�:�( �,���� 1905 o%v�t:Rtmissioners -- <br /> Address ox — <br /> -ChapzL A Tess <br /> ]1._2I.�,�.�Z .14 C. 27702 _ 2727 <br /> BY ,+ <br /> BY <br /> T}ATL D E ,,. Z!� — <br /> BATE /�1 I-/_/�— <br /> AAA DOCUMENT Gift CIJANe, ORDER Af RIL 197p ; );j fC),N AJAO� <br /> AMERICAN 1N51'111ME OF AKC1117 C;IS,1735 NEW YORK AVE,., N11',"'-'A""NGTON,I D C..•20(hlr- <br /> ONE 1'Ar:1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.