Browse
Search
Agenda - 11-05-2007-4k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 11-05-2007
>
Agenda - 11-05-2007-4k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:01:55 AM
Creation date
8/28/2008 10:27:44 AM
Metadata
Fields
Template:
BOCC
Date
11/5/2007
Document Type
Agenda
Agenda Item
4k
Document Relationships
Minutes - 20071105
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
S Finance - Tax-Exempt Financing Arrangement Efland Vol Fire Co Inc. Construct New Fire Substation
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT <br />Craig N. Benedict, AICP, Director <br />~°u°ip. u/ ~~ <br />Current Planning Division ~~ + ~ '~ 306E Revere Road <br />(919) 245-2575 ~z ~, ~ P O Box 8181 <br />(919) 644-3002 (Fax) ~,° Hillsborough, <br />www.co.orange.nc.us '~~<<h ~ar~~~°' North Carolina, 27278 <br />`~•~ ., 'tj _ I ~~ r ~cp~ - , ~ :,~ 0000 ~ `:'~ k121s <br />m. ,. _., <br />t :.: <br />October 11, 2007 <br />Mr. Greg Andrews <br />THD Construction, Inc. <br />P.O. Box 536 <br />Efland, NC 27243 <br />Re: Efland Fire Department <br />PIN: 9835-60-0981 <br />Dear Greg: <br />Staff has reviewed your application for the new Efland Fire Department building to be located on <br />US Highway 70 in the Cheeks Township. <br />Your project is APPROVED contingent with .the following conditions: <br />1. Any lighting to be provided in the future on the site shall obtain a zoning permit to verify <br />compliance with the Orange County Lighting Standards as set forth in Section 6.31 of the <br />Zoning Ordinance. Once an electrical permit is approved, all lighting plans shall be <br />maintained in accordance with the zoning approval. <br />2. A Type E Landscape Buffer (75-feet width) shall be installed or maintained along US 70 <br />West as shown on the approved site plan. . <br />3. Signage has not been shown on the site plan; therefore, no signage is approved at this <br />time. Prior to the installation of any signage, a signage, plan shall be reviewed and <br />approved by this office. <br />4. All erosion control measures shall be adhered to until erosion control inspectors give <br />final approval that the site is properly stabilized. <br />5. .The NCDOT office in Graham shall approve all driveway construction prior to issuance <br />of zoning approval for a Certificate of Occupancy of the site. <br />As we discussed, you may wish to move the septic field to an alternate location on the <br />northern end of the property. Prior to grading for the alternate location you will need to <br />contact erosion control with your intentions and to determine their requirements. Also, you <br />will need to submit a revised site plan to this office for review and approval. Staff will work <br />
The URL can be used to link to this page
Your browser does not support the video tag.