Orange County NC Website
J A M E S M . W F= 8 8 , A , f A . -. A . I . P <br /> A R C H I T E C:: T & P L A N N E R <br /> MENMR AMERICAN INSTITUTE OF ARCHITECTS AND AMERICAN INSTITUTE OF PLANNERS <br /> Low Bid A 1 sis - D.P.C. per Bids 7/1.2/77 201 EAST noSEMA. Rr , T.. <br /> CHAPS( HILL, N. C . 27514 <br /> T E L E P H O N P 9 ? 4 - 6 3 5 <br /> I. Old Cl ssroom Bldp Renovation & Alterations <br /> a) Bae Bid <br /> f 1) Gen' 1 (Triad) $189,800.00 <br /> "" 2) Elec. (Pend. & Thom.) 49,883.00.. <br /> s 3) H/AC (Car.Air Cond.) 89,257.00 $1,66,440.00 (Total Mech.) <br /> 4) Plumbing (Brown Bras.) 27 300.00 <br /> 5) Base Bid Total $356,240.00 <br /> 6) 1% Contingency $ 31562.40 <br /> 7) Base plus #b $359,802.40 <br /> 8) Architect �. 34,181.19 <br /> 9) Min, Cost Total $3931983.59 <br /> 10) Total Funding Available (per J. Turner) $411,765.00 <br /> 11) Diff. (10-9) Available for Add-On Alt. $ 17,781.41 <br /> i.e. New Roof instead of patching old (Alt.#2) <br /> Base Bid $13,300.00 <br /> Arch. 1,263.50 <br /> Total $14,563.50 --- Bal. $ 3,217.91 <br /> b) Neu insulated windows instead of re-glazing <br /> existing (Alt. #3) <br /> Base Bid $12,800.00 <br /> Arch. $ 1,216.00 <br /> Total $14,016.00 diff. � 101798.09 (Addition <br /> 1.1. Old Cafeteria Bldg,- Base Bid Cost ((Alt. #1) funding needed for new wxrLc <br /> a) Ba a Bid <br /> 1) Gen' l (Triad was low bid) $43,800.00 <br /> 2) Elec. (Pend. & Thom. low) $ 8,724.00 <br /> 3) H/AC (Car. Air low) $12,200.00 $28,924.00 (Total. Mec <br /> 4) Plumbing (Brawn Bros 2nd but $ 8,000.OQ <br /> low on Classroom Bldg) <br /> 5) Total Base Cost $72,724.00 <br /> 6) Contingency 1% 727.24 <br /> 7) Base plus #6 $73,451.24 <br /> 8) Arch. $$ 6--- 7 <br /> 9) Total Cost ,580,429.11 <br /> "�*- r' <br /> 7 <br /> Prepared by .lames M. Webb, Architect <br />