Orange County NC Website
r <br /> ,1 �k M 6 S M . W 9 B B , A . [ . A . - A . 1 . P . <br /> A C H ! T E C T & P L A N N E R <br /> MEMBER AMERICAN INSTITUTE OF ARCHITECTS AND AMERICAN INSTITUTE OF P�NNERS <br /> Low Bid Analysis - O.P.C. per Bids 7112/77 2 01 E A S T R O S E M A R Y ST- <br /> CHAPEL HILL. N. C. 27614 <br /> T E L E P H O N E 92 4 - 6 3 8 5 <br /> I. Old C1assroom g� Renovation & Alterations <br /> a) Bas----ems <br /> 1) Gen' l (Triad) $189,800.00 <br /> 2) Elec. (Pend. & Thom.) 49,883.001 <br /> 3) H/AC (Car.Air Goad.) 89,257.00 $166,440.00 (Total Meth,.) <br /> 4) Plumbing (Brown Bros.) 27 300.00 <br /> 5) Base Bid Total $3560240.00 <br /> 6) 1% Contingency $ 3,562.40 <br /> 7) Base Plus #6 $359,802.40 <br /> 8) Architect 1 34 181.19 <br /> 9) Min. Cost Total $313 983.59 <br /> 10) Total Funding Available (Per J. Turner) $411,765.00 <br /> 11) Biff. (10-9) Available for Add-On Alt. $ 17,781.41 <br /> i.e. New Roof instead of patching old (AIt.42) <br /> Base Bid $13,300.00 <br /> Arch. L,I,263.50, <br /> Total $14,563.50 --- gal. $ 3,217.91 <br /> b) New insplated windows instead of re-glazing <br /> existing (Alt. #3) <br /> Base Sid $12,800.00 <br /> Arch. "!� 216.00 <br /> Total $I4,016.00 ___ di£f. <br /> 10,19-8-09 (Addit;io <br /> 11. Old Caafteria Bldg, - Base Bid Cost (Alt. #1) funding needed for new win <br /> a) Base Bid <br /> 1) en' l (Triad was low bid) $43,800.00 <br /> 2) plec. (Pend. & Thom. low) $ 8,724.00 <br /> 3) /AC (Car. Air low) $x,2,200.00 X528,924.00 (Total Me <br /> lumbing (Brown Bros 2nd but $ 8,000.0 <br /> low on Classroom Bldg) <br /> 5) 'otal Base Cost $72,724.00 <br /> 6) ontingency 17 727.24 <br /> 7) se plus #6 $73,451.24 <br /> S) ch. $ 6 977.87 <br /> 9) Total Cost 80 429.11 <br /> A <br /> Prepared by �ames M. Webb, Architect <br />