Orange County NC Website
memorandum Planning Hoard <br /> December 1, 19BO <br /> Page 7 <br /> industrial Activity nodes by the adopted Land Use Pfau. <br /> 4.2.16 5) At the end of this subsection add, "as designated by <br /> the adopted Land Use Plan." <br /> 4.2.19 1) At the end of this subsection add "and located outside <br /> of Chapel Sill and Carrboro rural buffer areas." <br /> 4.2,20 3) After the word collector add, "as designated by the <br /> adapted Land Use Plan." <br /> 4.2.21 4) At the end of this subsection ,.addr "as designated by the <br /> adopted Land Use Plan. Access to rail service is desireable <br /> but not required." <br /> 4.2.22 2) Delete this subsection. <br /> 4.2.23 a) Intent - Delete "R_1" <br /> b) 1. Delete "rural residential or" <br /> 4„2,24 a) Intent <br /> After the word "development" add "In addition these lands <br /> will be managed in ways that will prevent any internally, <br /> generated adverse impacts from affecting surrounding <br /> property. <br /> b) Application Criteria <br /> 1) Add after "Eno" the word "River" and in the second line add <br /> "educational" after "private". <br /> 4.3 <br /> -H-4 Delete from AR and R1 <br /> -Delete the words "Such as off street parking, home occupations, <br /> greenhouses." <br /> -P-2 Add in PID district. <br /> -P-10 Add "rescue squads and volunteer fire departments" <br /> -P-11 Delete from R-2, R-3, R-4, 01 <br /> -P-12 Delete from R-2, R--3, R-4, R-5, 01. <br /> -P-16 Add "water and sewer treatment plants" and delete "pumping <br /> stations" <br /> --P-17 Delete "water and sewer treatment plants" and add "pumping <br /> stations" <br /> -Add a P--24 Governmental Facilities and Office Buildings - show <br /> as a permitted use in all districts except AS and PIT] <br /> -S°B Delete from AR <br /> -S-18 Delete from 1-3 and ED <br /> -5-19 Change to Class A permit <br /> --S- 29 Delete from I-3 <br /> i , <br />