Orange County NC Website
Memorandum Planning Board <br /> December 1, 1980 <br /> Page 13 <br /> method of water supply and sewage disposal_ <br /> 4. Normally, the maximum amount of land zoned PD-C(L) <br /> shall not exceed nine acres, but five acres shall <br /> apply in rural areas where population density is lower <br /> and distributed more widely than in the Transition area.. <br /> 5. Access. PD-C(L) centers shall be located only with <br /> direct access to and focused on the intersection of <br /> streets of a collector or more intensive use category, <br /> or on suitable frontage roads adjacent to such streets. <br /> Access from minor streets is prohibited, except where <br /> such access would fiot encourage through traffic on <br /> such streets. <br /> 7.14.1 <br /> The first two paragraphs will be a) as written_ The <br /> following section will be b): <br /> b) Application Criteria <br /> This district will usually be applied where the following <br /> conditions exist: <br /> 1. Designated by the adopted Land Use Plan as a Transition <br /> Area which can reasonably be annexed by a municipality <br /> in the ensuing 10-20 years. <br /> 2. Water and sewer lines should exist at the site or be <br /> assured of installation as part of the development <br /> process. <br /> 3. 'Vehicular access must be of direct access to a street <br /> classified either arterial or collector by the adopted <br /> Land Use Plan. <br /> 7.14.2 <br /> a) Permitted Principal Uses and structures shall be <br /> according to Article 4, for the applicable residential <br /> district. The exact use shall be as approved by the <br /> ,Board of County commissioners and shall not change with- <br /> out approval of the Board of Commissioners., <br /> I <br /> . .15.1 <br /> i - <br /> f b) Add the following after the first paragraph and delete <br /> i "access". <br /> I <br /> I <br /> r <br />