Browse
Search
Agenda - 11-24-1980
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1980
>
Agenda - 11-24-1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 3:36:03 PM
Creation date
7/7/2015 9:50:49 AM
Metadata
Fields
Template:
BOCC
Date
11/24/1980
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19801124
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1980
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h) The Board of Commissioners shall require for all extractive <br /> uses a performance guarantee to insure that the provisions <br /> of the Rehabilitation Plan are met. Such performancnttorneX <br /> guarantee shall be in a form approved by the County <br /> and shall, it the forms of Rehabilitation Plan are not <br /> met, enable the County to do so. <br /> B.9.2 Land£ _(Cla end Cass B S ecial Use <br /> 8.9.2.1 Additiaz�al Re irements <br /> In addition to the basic information required by Section <br /> the following information shall be supplied as <br /> part of the application: <br /> I <br /> a) Three copies of a Siteooxreng neera C prepare by a North <br /> which shall or registered land survey <br /> . <br /> the following: <br /> 1) North point, scale and date; <br /> 2) Extent of area to be filled. <br /> 3) Location, width and elevation of all easements and rights- <br /> of-way within or adjacent to extraction Location on site; <br /> q} Location of all existing or propc <br /> 5) Location of all areas on the site subject to flood hazard <br /> or inundation; <br /> 6) Location of all water courses on the site, including <br /> direction of flow and normal fluctuation of flow: <br /> 7) Existing topography at a contour interval or one foot, <br /> based on mean sea level datum: tent a£ overburden, <br /> g) Typical cross sections showing <br /> extent of fill and water table elevation, based on mean <br /> sea level datum: areas for overburden, by- <br /> products Proposed handling and storage <br /> products and fill materials; arkin service <br /> 10) Proposed fencing, screening and gates; p g. <br /> and ether areas; nding: and <br /> 11) Any areas proposed for po <br /> 12} Access roads to the site, as well as an-site roads, with <br /> indication Of surface treatment to limit dust. <br /> I <br /> b} An Operation Plan which shall include: <br /> i <br /> 1} The date Of commencement of op erations and their expected <br /> duration. <br /> 2) Proposed hours and days Of operation. <br /> 1 3) Complete description of operation, including source of <br /> materials, method Of compaction, type of sealing proposed, <br /> type and number of equipment to be used, <br /> among phases. <br /> i 4) Any phasing of OPerato be and relationship <br /> 5) operating practices t 8,2.2.ensure compliance <br /> with pe <br /> i <br /> I <br /> i <br /> f B-10 <br /> k <br />
The URL can be used to link to this page
Your browser does not support the video tag.