Browse
Search
Agenda - 11-24-1980
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1980
>
Agenda - 11-24-1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 3:36:03 PM
Creation date
7/7/2015 9:50:49 AM
Metadata
Fields
Template:
BOCC
Date
11/24/1980
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19801124
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1980
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3) Estimated type and volume of extraction, <br /> 4) Description Of method of operation' including the (5is° <br /> position of topsoil, overburden and by-products, <br /> 5) Description of equipment to be used in the extraction <br /> process. <br /> 6) Any phasing of the operation and the relationship among <br /> the various phases. <br /> 7) operating practices which wilirbe�ioelpwetppeatponarith <br /> the performance standards applicable <br /> (See Subsection <br /> c) A Rehabilitation Plan which shall include. <br /> 1) A statement of planned rehabilitation of the excavated <br /> land, including detailed methods of accomplishment and <br /> planned future use of the rehabilitated land. <br /> 1 2! A snap showing the final topography, after rehabilitation, <br /> to the same scale as Site Plans it shall also depict any <br /> water areas and methods for preventing stagnation and <br /> pollution thereof, landscaping and ground cover proposed <br /> to be installed and the amount and type of back ;ill to <br /> be employed, if any. <br /> 3) A phasing and timing plan, related to the phasing and timing <br /> portion of the operations Plan, showing the progression of <br /> the rehabilitation and the date when it will be complete' <br /> 4) The method of disposing of all equipment, structures, dikes <br /> and spoil piles associated with the operation. <br /> d) The name, address and signatures of land owners and applicants. <br /> e) A written legal description or survey of the property, <br /> prepared by a North Carolina registered land surveyor or <br /> engineer. <br /> f) A fee, as set by the orange County Hoard of Commissioners. <br /> B.8.1.2 Standards For Evaluation <br /> The following standards shall be used in evaluating an <br /> application for a permit to conduct extraction of earth <br /> products: <br /> a) All operations associated with the extraction shall conform <br /> to the following performance standards: <br /> 1) Direct illumination resulting from the operation shall not <br /> i <br /> fall upon any land not covered by the application. <br /> 2) Equivalent sound levels at the boundaries of the extraction <br /> site shall not exceed the following standards= <br /> between 7:00 a.m. and 6:00 p.m. 55 dRA <br /> between 8:00 p,m. and 7:00 a.m. 45 d8A <br /> 3) Vibration levels at the boundaries of the extraction site <br /> shall not exceed the following standards: <br /> 8-8 <br /> I <br /> #i <br /> [f <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.