Browse
Search
Agenda - 06-23-1980
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1980
>
Agenda - 06-23-1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 4:09:03 PM
Creation date
7/7/2015 9:10:06 AM
Metadata
Fields
Template:
BOCC
Date
6/23/1980
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19800623
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pape 4 <br /> DATA ANALYSIS PAST PROJECTS <br /> The figures in this section provide estimates of the cost of the <br /> Erosion Control Program to the County. This cost was then compared <br /> to project disturbed area and project duration. The intent herein <br /> is to develop a permit fee schedule which will generate enough <br /> capital to defray either 50% or 100% of the Erosion Control Program <br /> costs. Two periods were analysed. Ltay 1, 1976 to December 1, 1979, <br /> or the program since its inception, and fiscal year 1978-79, the <br /> most recent complete fiscal. year. _ <br /> Area disturbed is listed in 10,000 square foot increments as acres <br /> are no longer used in ordinance related areal criteria. Time incre- <br /> ments of six (6) months were selected. Area-time increments (used <br /> in cost analysis) were generated by multiplying the area disturbed <br /> by the project duration. <br /> May 1, 1976 to December 1, :1979 <br /> 61 - plans submitted and grading permits issued <br /> 144 - plan exemption forms issued <br /> 36 - sites where no permit obtained <br /> 432 - acres disturbed on these sites <br /> for a total o€: <br /> 6,004 area-time increments <br /> (definition) (an area-time increment is 10,000 square feet disturbed over a _ <br /> 6 month period) <br /> $83,000 Estimated budget, Soil and Erasion Pro-ram <br /> $15,000 Fines assessed <br /> $68,000 Net cost of soil and Erosion Program <br /> Fiscal. Year 1978--79 <br /> 51 Sites with plans that were active during the year <br /> 64 Sites without plans <br /> 354 Acres disturbed on these sites <br /> for a total of: <br /> 2,361 area--time increments <br /> $32,105 Budget for Soil and Erosion Program <br /> COST ANALYSIS pRoGg_&A SELF-SUFFICIENCY <br /> ment are estimated utilizing the foliowing <br /> permit fees per area-time incre <br /> alternatives: 1 <br /> I. 6,004 area-time increments with debt of $68,000 <br /> 11. 2,361 area-time increments with debt of $32,105 <br /> III. 2,361 area-time increments with debt of $45,000* <br /> Iv. 2,361 area--time increments with debt of $16,050 <br /> V. 2,361 area-time increments with debb of $22,500 <br /> (IV. and V. represent 50% of program costs for cases II & III) <br /> ::Estimated cost Of program assuming one additional inspector and vehicle. <br /> R <br /> ,Fa <br />
The URL can be used to link to this page
Your browser does not support the video tag.