Orange County NC Website
y � <br /> 1 <br /> Page 3 <br /> CrITHOUT FIRST OBTAINING A <br /> DOUBLE REGULAR PERMIT FEE IF GRADING IS BEGCIN <br /> PEM111 problems when first <br /> This is obviously a deterrent device. It may cause p <br /> "word gets around." I suspect that to legal'Y apply <br /> implemented until ermit. <br /> this provision, it would be neccessary t of to obtaining afper der i had <br /> 20,000 square feet P e County Ordinance is <br /> graded in excess of . <br /> incorporation Of this provision into the Orange <br /> recommended. <br /> DEVELOPER IS REQUIRED TO POST PERFO&MANCE BOND FOR. PE1L1ANENT STABILIZATION <br /> WORK, <br /> aped to ensure that funds wall be developer bank- <br /> This provision is desire <br /> provide a ground cover over the site in the ere-developmentpcosts. <br /> ruptcy. This provision increases develop P considerably <br /> provided in advance of here iuctrecedenceafor posting of can <br /> Estimates p water and <br /> from contractor to contractor. There as Precedence <br /> bonds to ensure the completion of nCounty Subdivision ge0rovide <br /> sewer systems provided i.n the Orange ordinance p <br /> Sections Bb, sc, 13, 11 , and 20 in the existing situations involving <br /> administrative and legal procedures for resolving <br /> tion of disturbed areas. <br /> the permanent stabiliza <br /> After considering all asp <br /> ect$ Of this provision, I do not feel. that <br /> its inclusion in the ordinance is necessary. <br /> CHARGE FOR COPIES OF THE ORDINANCE a charge of $2 O0 per COPY I recommend <br /> Ordinance length is 17 pages, therefore, <br /> should be sufficient to recover reproduction costs. <br /> adoption of this rate- <br /> BASIS <br /> TO pIUNICIPALITIES ON A PER CAPITA BASIS FOR. INSPECTION AND ENFQRCE-- <br /> 14ENT SERVICES Purposes' but <br /> opposition from the governing bodies °f the three <br /> This provision has obvious value for revenue generation f titer <br /> is likely to meet Opp <br /> towns. A provision such as this should be Coupled n a tag <br /> to this approach. As <br /> control {by reduction of the minimum area recTuirements) in order o <br /> Of water and sewer allow form ore <br /> provide an incentive to the Towns for agreeing general <br /> municipal zoning and availability <br /> intensive land uses, and property line buffers are g <br /> in negligible in urban areas, a smaller minimum areal requirement <br /> would be appropriate within ng bodies governing gates trill be explored <br /> z recommended that the g possibility- <br /> least be approached about this P ram Self-Sufficiency. <br /> later in the section entitled Pros <br />