Orange County NC Website
V <br /> AGENDA ITEM # 14 <br /> The County has been billed for two change orders at the <br /> Human Services Center that have been discussed with the Board <br /> but we find no formal record of their approval in your minutes. <br /> A) Modification to the Thermal Windows. <br /> You will recall the thermal windows originally proposed <br /> for this project did not receive approval of the Historic District <br /> Commission. The windows as originally proposed had three panels <br /> of glass and no mullions, The Commission required windows of <br /> two panels (double hung) with mullions, This modification cost <br /> $6,630 and was reviewed with the Board, at least informally, last <br /> fall. <br /> B) Rock in Shaft of Elevator I. <br /> Our construction contract at the center carries a rock <br /> excavation clause. In August, rock was encountered in the shaft <br /> of elevator II, At that time, the Board approved a contract <br /> modification for $1,760. The shaft for elevation I was dug in <br /> the early winter. The contractor again encountered rock. The <br /> --architect has approved a $4,000 payment for this work. <br /> rA <br />