Orange County NC Website
- 2 - <br /> Memo - !Orange County Commissioners January 12, 1980 <br /> 2. Well Installation Inspection <br /> Estimate ability for o4e man to respond to 3 wells <br /> per day. Daily cost = 83,77 = 3 27.92/finished well <br /> (No addition charge for extra trips necessitated <br /> by dry holes) <br /> 3. Sampling and Final Inspection <br /> Estimate 8 wells per day. Daily cost = 10.47/well <br /> (Reswnpling visit if necessary is included at no <br /> extra charge) <br /> TOTAL ,BELL FEE'S - 47.12 <br /> Therefore, the Board of Health and the <br /> Health Director recommend that the fees <br /> be set as follows: <br /> 1. Well Site Placement Inspection 9.00 <br /> 2, Well Installation Inspection 23,00 <br /> 3. Sampling and Final. Inspection 10.00 <br /> Total fees for the Health Department's <br /> services per each well $ 47.00 <br /> JR <br />