Browse
Search
2015-304-E Solid Waste - HDR Engineering Inc. of the Carolinas - Amendment to contract dated June 10, 2013 for the provision of professional services to the County
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-304-E Solid Waste - HDR Engineering Inc. of the Carolinas - Amendment to contract dated June 10, 2013 for the provision of professional services to the County
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 3:42:31 PM
Creation date
6/30/2015 10:36:10 AM
Metadata
Fields
Template:
BOCC
Date
6/29/2015
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Chair signed
Document Relationships
2013-173 SW - HDR Engineering Inc of the Carolinas for General Engineering Purpose for Solid Waste $Varies
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
R 2015-304-E SW - HDR Engineering Inc. of the Carolinas - Amendment to Contract dated June 10, 2013 for professional services to the County
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8A012539-E9FD-4FOB-956E-39B8B9E60F51 <br /> 2 <br /> NORTH CAROLINA <br /> CONTRACT AMENDMENT <br /> ORANGE COUNTY <br /> THIS CONTRACT AMENDMENT ("Amendment") is made and entered into this 10th day of June <br /> 2015 by and between ORANGE COUNTY (hereinafter referred to as "County") and HDR ENGINEERING,INC. OF <br /> THE CAROLINAS, (hereinafter referred to as "Consultant"). <br /> WITNESSETH: <br /> THAT WHEREAS, the County and Consultant entered into a contract dated June 10, 2013, for the provision of <br /> professional services to the County(hereinafter the"Original Agreement"); and <br /> WHEREAS, the County and Consultant desire to extend the Original Agreement while keeping in effect all terms and <br /> conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. <br /> NOW THEREFORE, for and in consideration for the mutual covenants and agreements made in the Original Agreement <br /> and herein,the parties agree to amend the Original Agreement as follows: <br /> I. The Term of the Original Agreement is hereby extended through June 10,2017. <br /> 2. The current Rate Schedule used for determining invoice amounts shall be replaced with the updated Rate <br /> Schedule, attached. <br /> 3. Except for the changes made herein, the Original Agreement shall remain in full force and effect to the extent <br /> it is not inconsistent with this Amendment. <br /> IN TESTIMONY WHEREOF, this Amendment has been executed by the parties hereto, as of the date first above <br /> written. <br /> M tKu COUNTY CONS 7R15921044097405 ned by: <br /> hb <br /> sk at r <br /> 7�FEE642&&ES417_ <br /> nMOStel 1 e_r, <br /> Chair Printed name/title: <br /> SVP <br /> ria yto technical content <br /> a (LS6Vu <br /> FFnav1A4 <br /> Department Director <br /> This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control <br /> pocuSigned by: <br /> 239nFFC2CFA847B... <br /> Office of the Chief Financial Officer <br /> P �s� ao form and legal sufficiency: <br /> , b�t,la <br /> _EAA3�.33EIISA84�fi.__ <br /> Office of the County Attorney <br /> Rev. 3/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.